My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/07/02 Council Agenda Packet
>
Council Agenda Packets
>
2008
>
2008/07/02 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2017 11:43:34 AM
Creation date
3/24/2017 11:42:57 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/2/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. _< 3. N <br /> 9 <br /> CH2M■ ■ILL <br /> Exhibit A—Scope of Work <br /> Amendment No.4 <br /> CITY OF EVERETT 41ST STREET ARTERIAL <br /> DRAINAGE DESIGN, CONSTRUCTION PHASE <br /> FOR <br /> PERTEET,INC. <br /> April 25,2008 <br /> • <br /> Purpose <br /> This scope of services is Amendment 4 to the original scope of services between Perteet and <br /> CH2M HILL(SUBCONSULTANT),contracted August 16,2006.The scope of work for <br /> Phase II(Final Design)under Amendment 1 has been completed to date. This scope of <br /> services includes project management and construction design services as described below. <br /> Task 5 — Construction-Phase Services <br /> Task 5.1 Field Support <br /> Subconsultant will provide field support for the City of Everett during construction as <br /> required to address construction issues related to stormwater drainage facilities. <br /> Task 5.1 Assumptions: <br /> • Perteet and/or the City will provide a construction inspector who is primarily <br /> responsible for daily inspection and management of construction activities,including <br /> the tracking and review of material quantities,submittals,change orders,pay estimates, <br /> record drawings,etc. <br /> • While providing construction observation assistance,the Subconsultant shall assume no <br /> responsibility for proper construction techniques and job site safety.The Subconsultant <br /> cannot guarantee the Contractor's performance and shall not be responsible for <br /> construction means,methods,techniques,sequences of procedures,or for safety <br /> precautions and programs in connection with the work performed by the construction <br /> contractor(s),and any subcontractors. <br /> Task 5.1 Meetings: <br /> • The Subconsultant will not attend the pre-construction meeting. <br /> • The Subconsultant will attend up to three(3)field meetings and site visits(same trip, <br /> assuming 4 hours each trip) <br /> DOT Form 140-063 EF J:\Trans_Design126066-41st St Arterial-Broadway Scoping Study\Project Management\Contracts\Supp 5_06-09-08.doc <br /> Revised 9/2005 Page 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.