8 <br /> Task 5.2 Office Support <br /> The Subconsultant will provide office support for Perteet during construction as required to <br /> address construction issues related to stormwater drainage facilities,including design <br /> clarifications,review of Contractor submittals,responses to requests for information(RFD, <br /> and provide supporting information for change orders. <br /> Task 5.2 Deliverables: <br /> • Assist Perteet with the review of submittals(up to 3). <br /> • Respond to requests for information from the Contractor(up to 3). <br /> • Assist Perteet with the development of a punch list upon substantial completion of the <br /> construction work. <br /> • Change order support documentation(up to 3) <br /> Task 5.3—Construction Phase Project Management <br /> The Subconsultant will prepare monthly progress reports and invoices documenting work <br /> completed to-date.The contract budget will be summarized and a short description of <br /> activities during that period will be provided. <br /> Task 5.3 Assumptions: <br /> • Progress reports and invoicing will occur on a monthly basis. <br /> Task 5.3 Deliverables: <br /> • Progress reports and invoicing. <br /> • Project management and team coordination. <br /> Task 5 Schedule: <br /> • Construction is expected to be six months in duration(June,2008 through March,2009). <br /> 2 <br /> 'j <br /> DOT Form 140-063 EF J:1Trans_Design\26066-41st St Arterial-Broadway Scoping Study\Project Management\Contracts\Supp 5_06-09-08.doc <br /> Revised 9/2005 Page 18 <br />