Laserfiche WebLink
9 <br /> • <br /> EXHIBIT B <br /> Hough Beck&Baird Inc. <br /> City of Everett <br /> 41st Street/Broadway Arterial Project <br /> May 14,2008 <br /> Construction Assistance <br /> Scope of Work and Descriptions by Task <br /> Project Computer Business Admin.I <br /> Principal Manager Design Staff Tech. Mgt Clerical <br /> Item I SCOPE OF WORK $ 60.60 $ 38.60 $ 29.70 $ 23.00_$ 30.50 $ 17.50 � Salary Cost <br /> 1 Construction Assistance <br /> 1.a Submittal Review 4 0.5 $ 163.15 <br /> 1.b Contract Document Interpretation 4 0.5 $ 163.15 <br /> 1.c Change Review 0.5 4 2 0.5 $ 239.45 <br /> 1.d Construction Observation and Field <br /> Repprts.Three(3)1"• ..r``q 1.5 18 '.. 1.5 $ 811.95 <br /> ; <br /> SubtotalsX -= 26 a 30.1at:- 13�-77) <br /> Reimbursable l Salary Costs' $ 1,377.70 l <br /> Direct Salary Cost at 1.00 $ 1,377.70 <br /> Total Cost at 2.8626 $ 3,943.80 <br /> Total Reimbursable Expenses $225.00 <br /> TOTAL COST OF SERVICES $ 4,582.11 <br /> • DOT Form 140-063 EF J:tTrans_Design126o66-41st St Arterial-Broadway Scoping Study\Project Management\ContractstSupp 5_06-09-08-doc <br /> Revised 9/2005 Page 21 <br />