Laserfiche WebLink
0 mss• ' <br /> • <br /> CITY OF EVERETT <br /> PROFESSIONAL SERVICES AGREEMENT <br /> General Engineering and Consulting (GEC) Management <br /> Riverfront Development— Landfill gas, leachate collection system, storm <br /> water, and sewer design <br /> THIS AGREEMENT made and entered into on this day of , 2008,by and <br /> between the CITY OF EVERETT,a municipal corporation under the laws of the State of Washington, <br /> hereinafter referred to as the"City,"and BHC Consultants,LLC., whose address is 720 Third Avenue, <br /> Suite 1200, Seattle,WA 98104-1820 hereinafter referred to as the"Contractor." <br /> WHEREAS,the City desires to engage the Contractor to provide general engineering and consulting <br /> management services for the Everett Riverfront Development—Modified Group2: Leachate,Landfill Gas <br /> (LFG), Stormwater, Sewer and Lift Station Design project(s); and <br /> WHEREAS,Contractor represented,and by entering into this Agreement now Represents,that it has <br /> received and has familiarized itself with the requirements of the Property Disposition Agreement between <br /> the City of Everett and OliverMcMillan, LLC, dated February 21, 2007,and the Consent Decree entered <br /> into between the City and Ecology dated April 2, 2001, including the Consent Decree's Restrictive <br /> Covenant dated January 14,2002 and final Cleanup Action Plan; and <br /> WHEREAS, Contractor represented, and by entering into this Agreement now represents,that it is fully <br /> qualified to perform the work to be performed hereunder in a competent and professional manner; <br /> NOW,THEREFORE,the parties herein do mutually agree as follows: <br /> 1. Engagement of Contractor. The city hereby agrees to engage the Contractor, and the <br /> Contractor hereby agrees,to perform the work in a competent and professional manner consistent with the <br /> standard of care used by other experienced and skilled professionals providing similar services. <br /> Contractor shall provide the services described in the attached"Exhibit B—Scope of Work". The Scope <br /> of Work so identified is hereafter referred to as"Work". Without a written directive of an authorized <br /> representative of the City,the Contractor shall not perform any services that are in addition to,or beyond <br /> the scope of,the Work. If the Contractor's proposal is attached as an exhibit,and if such proposal <br /> contains or incorporates any conditions or terms in addition to or different from the terms of this <br /> Agreement, then the Contractor expressly agrees that such conditions or terms are neither incorporated <br /> nor included into this Agreement between the City and Contractor. If,and to the extent the Work <br /> includes the design of a public work or improvement, in whole or in part,Contractor's design shall be <br /> reasonably accurate, adequate and suitable for its intended purpose. <br /> 2. Intellectual Property Rights. Reports drawings,plans, specifications and any other intangible <br /> property created in furtherance of the Work are property of the City for all purposes,whether the project <br /> for which they are made is executed or not,and may be used by the City for any purpose. Any re-use by <br /> the City of these reports, drawings, plans, specifications and other intangible property for purposes other <br /> than for this Project shall be at the City's sole risk,without liability or responsibility to Contractor. <br /> Unless otherwise expressly agreed in writing, all intellectual property rights in such documents or <br /> intangible property created pursuant to this Agreement,or for the City of Everett, belong to the City of <br /> Everett. Contractor retains any intellectual property rights in documents and intangible property created <br /> by Contractor prior to engagement,or not created by Contractor for its performance of this Agreement. <br /> rm <br />