My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/08/06 Council Agenda Packet
>
Council Agenda Packets
>
2008
>
2008/08/06 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2017 9:26:12 AM
Creation date
3/27/2017 9:25:39 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/6/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Time of Beginning and Completion of Performance. This Agreement shall commence as the <br /> date of execution of this Agreement and shall be completed by May 31, 2010. <br /> 4. Compensation. <br /> A. The City shall pay the Contractor only for completed Work and for services actually rendered <br /> which are described herein. Such payment shall be full compensation for Work performed or services <br /> rendered, including, but not limited to,all labor, materials, supplies, equipment and incidentals necessary <br /> to complete the Work. <br /> B. Contractor may receive payment as reimbursement for Eligible Expenses actually incurred. <br /> "Eligible Expenses" means those types and amounts of expenses either listed in Exhibit A or such <br /> expenses as are approved for reimbursement by the City in writing prior to the expense being incurred. If <br /> Exhibit A is either blank or not attached, expenses may not be reimbursed unless prior written approval <br /> was obtained from the City. An expense shall not be reimbursed if: (1) the expense is not identified in <br /> Exhibit A; (2)the expense exceeds the per item or cumulative limits for such expense if it is identified in <br /> Exhibit A; or(3)the expense was not approved in writing by an authorized City representative prior to the <br /> Contractor incurring the expense. If, and to the extent, overnight lodging in western Washington is <br /> authorized, Contractor is strongly encouraged to lodge within the corporate limits of City. When <br /> authorized, Contractor will be reimbursed 100% of lodging expense, if lodged within the corporate limits <br /> of the City, but Contractor will be reimbursed 50% of lodging expense when lodged outside the corporate <br /> limits of the City. If authorized, the City may (at its sole option) obtain or arrange air travel for the <br /> Contractor. <br /> C. Total compensation, including all services of the Contractor and its subcontractors, <br /> subconsultants, and agents and their expenses, shall not exceed a maximum of One Million One <br /> Hundred Fifty Thousand Dollars ($1,150,000). The rates for such services are attached as Exhibit <br /> A.The range of fees anticipated for Work on the following City Projects are as follows: <br /> (Known)Work Potential Fee Range <br /> GEC Management $50,000-$70,000 <br /> Preliminary Design $75,000-$150,000 <br /> Final Design $375,000- $530,000 <br /> Services During Bidding and Construction $100,000- $200,000 <br /> Evaluation and Consultation for Development $50,000-$100,000 <br /> Contingency and Misc.Projects/Tasks $75,000- $100,000 <br /> D. If Contractor fails or refuses to correct its work when so directed by the City, the City may <br /> withhold from any payment otherwise due an amount that the City in good faith believes is equal to the <br /> cost to the City of correcting, re-procuring, or remedying any damage caused by Contractor's conduct. <br /> 5. Method of Payment <br /> A. To obtain payment, the Contractor shall (a) file its request for payment, accompanied by <br /> evidence satisfactory to the City justifying the request for payment; (b) submit a report of Work <br /> accomplished and hours of all tasks completed; (c) to the extent reimbursement of Eligible Expenses is <br /> sought, submit itemization of such expenses and, if requested by the City, copies of receipts and invoices; <br /> and (d) comply with all applicable provisions of this Agreement. Contractor shall be paid no more often <br /> than once every thirty days. <br /> B. All requests for payment should be sent to: <br /> City of Everett <br /> Attn: Timothy L. Marks,P.E. <br /> 3200 Cedar Street <br /> Everett, WA 98201 <br />
The URL can be used to link to this page
Your browser does not support the video tag.