Laserfiche WebLink
I . <br /> a <br /> 3.9.2 As a condition of using the area described in subsection l0a <br /> above for temporary parking, construction staging and <br /> materials storage, PEMC will install landscaping of the Type <br /> required by the Planning Director along the northern edge of <br /> 13th Street for the width of such area, and provide temporary <br /> fencing and other suitable landscaping around the western, <br /> northern and eastern boundaries of such area. The plan for <br /> such landscaping will be reviewed by and must be approved by <br /> the Planning Director. <br /> 3.9.3 Until its development for hospital, clinic and medical-related <br /> activities, PEMC will utilize the area designated for heights of <br /> 45 feet and 75 feet for surface parking, subject to the Design <br /> Guidelines for"Parking Lots" and the requirements of EMC <br /> Chapter 19.35. <br /> 3.10 Phase I—Utility Building: <br /> 3.10.1 The Phase I Utility Building will be located south of the <br /> projected centerline of 12`h Street and sited within the area <br /> designated for a maximum of 85 feet in height. <br /> 3.10.2 The generator and boiler exhaust will meet or exceed the <br /> applicable emission requirements of the Occupational Safety <br /> and Health Administration(OSHA) and the American <br /> Conference of Governmental Industrial Hygienists (ACICIH). <br /> 3.10.3 Noise emitted from the Utility Building during normal, non- <br /> emergency operations will meet the City's daytime and <br /> nighttime noise limits. <br /> 3.10.4 Emergency generators will be operated only for emergency <br /> purposes and for required daytime testing once per month. <br /> J <br /> 26 <br />