Laserfiche WebLink
1311) •rABULAT•ION <br />Se vo- System Replacement F. Schedule. A <br />\W,n.# UP 3300- <br />Dore :=) 8;5/2008 <br />W <br />. Prepared BY: William Ban-eit <br />/'nn: /)ore I'nigl, /'I»jec•7 lalgineer <br />I'r1:M <br />I1'1:;,\4DEN'RIP1 ON <br />UNIT <br />OUANTIT <br />ENGINEER'S GSI'IMA•rE <br />UNIT TOTAL <br />PRIUrd AMOUNT <br />liunm Construction <br />LINI1 TOTAL <br />PRICE_ AMOUNT <br />Mid Mounwin Contractors <br />UNIT TOTAL. <br />PRICE AMOUNT <br />Gary Mci lino Construction <br />UNIT TOTAL <br />PRICE AMOUNT <br />Granife NSW (Wilder) <br />UNI'r TOTAL. <br />fRICF AMOUNT <br />I <br />Mobilization <br />LS <br />l <br />$173.000.00 <br />$175.000. <br />5292.800.00 <br />$292.501.(0 <br />5300.000.01 <br />$100,00000 <br />S.300.0)(1.00 <br />S11On.000.00 <br />1310.000.00 <br />S310.00100 <br />_ <br />T,.fk Control Let.. <br />HR <br />1,800 <br />540.00 <br />$72.000.00 <br />$40.00 <br />$72.000.00 <br />$40.110 <br />$72.000.00 <br />$4500 <br />$.91,000.00 <br />545.0 <br />$51,000.00 <br />Maintenance and Protection of Trak. <br />LS <br />1 <br />$20,0(01.0(1 <br />120,!X14! <br />$50,00)00 <br />$i0,000.191 <br />$6.1(9),0(1 <br />$6.500.00 <br />$5.(100.00 <br />E3.000M <br />525,0(10.1(1 <br />525.000.011 <br />., <br />:I <br />S.wcul P -n-1 <br />LF <br />4.300 <br />$2.30 <br />$10.750.00 <br />$1.00 <br />$I2.900.00 <br />52.25 <br />$9.675.00 <br />$IO0 <br />$4.100.00 <br />S2.00 <br />$5.600.00 <br />. <br />Sawr:ulPavemenl,Additional 1'Thickness <br />LF <br />3.100 <br />$450 <br />51.5511.01 <br />$0.50 <br />51.550.0 <br />50.40 <br />St.240.00 <br />$0.20 <br />S6_'01)0 <br />SO.30 <br />11.310.011 <br />I, <br />Street Cleanlnq and Sweeping <br />LS <br />1 <br />$14.0!1000 <br />114,000.(X1 <br />.$3(1.(XI(l.Oq <br />$30.000.0( <br />$10091.01 <br />510.00000 <br />.$40000.00 <br />.$40.000.00 <br />525,000.00 <br />1_'5.000.00 <br />- <br />Cnmrot Density Fill <br />CY <br />350 <br />515000 <br />$21,5(91.011 <br />51(1(1.00 <br />113,000.00 <br />5165.0) <br />524.730.00 <br />593.00 <br />519.250.00 <br />$14000 <br />$2 1.000,00 <br />5 <br />HMA CL 1/2' PG 64.22 <br />TN <br />350 <br />$100.00 <br />$15,000.(9) <br />$150.00 <br />$63.001,00 <br />5200.00 <br />$70.000.00 <br />$20).110 <br />$7(.(100.00 <br />$110.00 <br />.$43,500.00 <br />g <br />AsphaftTreated Be" <br />TN <br />150 <br />5100.00 <br />$ I i.000.00 <br />515400 <br />$27,(104(10 <br />$200.00 <br />510.000.00 <br />5130.00 <br />522,500.00 <br />$17_3.00 <br />$15.750.0( <br />10 <br />Pawtmera Patch (Temp) <br />TN <br />300 <br />.5110.00 <br />$.11.OM.00 <br />1100.00 <br />$30.000.00 <br />MOM <br />56(1.00(1.00 <br />$130.00 <br />$45.000.00 <br />5113.00 <br />540,300.00 <br />II <br />CSMH F12, Type I. OO Inch Dianmter <br />LS <br />1 <br />517.000.(1(1 <br />$17.000.0 <br />$15.0110.00 <br />S35.000.00 <br />1113.00(.011 <br />515,000.00 <br />$35.000.0(1 <br />$15,(X1(.00 <br />$110.000.00 <br />$1(1.1101.00 <br />12 <br />CSMH O I, Type 160 Inch Ol.nlael' <br />LS <br />1 <br />$11.00400 <br />SI 1.(X10.0(1 <br />$20.000.00 <br />$20.0100111 <br />SI i.000.00 <br />$13.0110.00 <br />$19.00400 <br />$19,000.00 <br />$12.01`1.00 <br />S12.000.0013 <br />CSMH FO, Type 160Inch Diam.lar <br />LS <br />1 <br />514.000.00 <br />$14.000.00 <br />$20,000.00 <br />S20.000.00 <br />S14.000.00 <br />$14,000.00 <br />$19.000.00 <br />$19,000.00 <br />$14,000.00 <br />514,000.00 <br />14 <br />CSMH F5. Type 160Inch Diameter <br />LS <br />1 <br />515.(8x).00 <br />$13.000.00 <br />$15.000.00. <br />$33.00(1.91 <br />110.000.00 <br />510,000.00 <br />.411.000.00 <br />$33,000.00 <br />$11.00(701) <br />531.001.0 <br />13 <br />CSMH 02. Type 1, 54 Inch Oiamnlor <br />LS <br />1 <br />$1,000.00 <br />57,000.00 <br />56.000.00 <br />$6,0(10.(X1 <br />11(.001(X1 <br />$10-.(100.00 <br />513 000).(1() <br />.S 13,000.111 <br />S 1 1.000.00 <br />$11,600.00 <br />1(, <br />CSMH 03, Type 1, 48 Inch Diameter <br />LS <br />1 <br />$6.00,10•(X0 <br />S(000.00 <br />$4.000.00 <br />$4.000.00 <br />$5.50000 <br />55.500.00 <br />$7.000.00 <br />$7,000.00 <br />$7,300.00 <br />$7.50(1()0 <br />17 <br />CSMH 08. Type 3, 90 Inch Out so, <br />LS <br />1 <br />S26.000.00 <br />$26,(X)0.01 <br />UAW) 00 <br />56000001' <br />.545.000.00 <br />149,01(1.(10 <br />$5(1.0000(1 <br />55000000 <br />564000(1(1 <br />$60,000.00 <br />I S <br />CSMH 09. Type 2. 72 Inch Diameter <br />LS <br />1 <br />,$14,000.00 <br />$ 4.000.00 <br />S 10.000.00 <br />$10.00(1.0( <br />$12.11(1(100 <br />$12.000.00 <br />$14.000.00 <br />$ 4,)(1110() <br />S 10.000.00 <br />$10,00x1.00 <br />I7 <br />CSMH 10. Type I. 48 Inch Diameter <br />LS <br />1 <br />$6,00000 <br />$600X0.00 <br />$5.001.00 <br />$5,00401 <br />$5.500.11(1 <br />$8.500.00 <br />$5,000.00 <br />58,000.00 <br />S1200000 <br />$12.000.00 <br />20 <br />CSMH. Typo 3. 72 Inch Diameter, Constructed within Embankment <br />EA <br />4 <br />SI 1.000.00 <br />$44,000.nn <br />$7.000.00 <br />528.000 <br />.$9.500.00 <br />115,00(.0) <br />$90(1(1.(1(1 <br />$36.0110.00 <br />S7,506.00 <br />S10.000.00 <br />21 <br />Ce,rrate Intel <br />EA <br />3 <br />52,0011.01 <br />$6,00(1.p0 <br />$1.50400 <br />S4.i01.(XI <br />$1._'0.01 <br />$3,60400 <br />$1.211400 <br />111.6011.00 <br />$1.501.110 <br />$45(1(100 <br />__ <br />Catch Basin Type 8 wilt, Gas Trap <br />EA <br />12 <br />$2400,01) <br />S28.800.1710 <br />11.$)70.00 <br />S2 1.600.00 <br />S1.55000 <br />$22'00.00 <br />$1,50000 <br />$_11.00.01 <br />13,100.00 <br />$17.20000 <br />Trench Excavation Solely System <br />LS <br />1 <br />590,0)0.1X) <br />$91),000. <br />$250,000.00 <br />S25000(1.(10 <br />$7:,000.110 <br />$72.000.00 <br />.53.00400 <br />13001).nn <br />$40.00400 <br />1-1O.000.o 1 <br />_ <br />24 <br />Surveying <br />LS <br />1 <br />120,010,00 <br />S-20,)01.( <br />53(1,010.0(/ <br />$30.01(1.(10 <br />$1:.'300.011 <br />$12.300.00 <br />57,(10(0)0 <br />$7.()(1000 <br />.1.10.01(111(1 <br />110.0(100!1 <br />Combin.d Sawar Pipe, Sri Inch PS -46 PVC <br />LF <br />212 <br />$25400 <br />$59,36!1.(10 <br />S200.00 <br />$42.40(1.(11 <br />$2'10,(10 <br />$61.45400 <br />5200.00 <br />$41:111(1.0 <br />.$420.00 <br />$5'),I4o.o(I <br />2(, <br />Combined Sewer Pip., 24 Inch PS -115 PVC <br />LF <br />420 <br />$.10400 <br />$126.101.!)( <br />S260.00 <br />5109.200.0) <br />53i0.00 <br />S147,000,00 <br />$25400 <br />.$)(13,00400 <br />14X0.0(1$201.600.00 <br />27 <br />Combined Sewer Pipa, 2.4 Inch PS -46 PVC <br />LF <br />186 <br />S200.00 <br />537,200.01 <br />S241.00 <br />$44.640,00 <br />5385(10 <br />S71.(, 111(9) <br />S200.00 <br />$17,2(1(1(10 <br />554000 <br />1100,440.00 <br />29 <br />Combined Sawn, B Storm Orlin Pipe. 12 Inch SDR 35 PVC <br />LF <br />281 <br />$133,00 <br />.S17}),1$(X1 <br />$110,0(1 <br />$36.5010(1 <br />5200.01 <br />556,20400 <br />$50.00 <br />$14,0$0,00 <br />5.3000 <br />$14.0.10.00 <br />119 <br />Combined Sewer Pipe, 81nch SDR 28 PVC <br />LF <br />187 <br />$19400 <br />$35.530.00 <br />$123,00 <br />$23.375,0 <br />$183.00 <br />534,595.00 <br />$10.01 <br />$56.1(10.(10 <br />5140.00 <br />5261150.00 <br />311 <br />Combined Sewer Pipe 6 Storm Drain Pipe. 8 Inch SDR 35 PVC <br />LF <br />344 <br />S110.00 <br />$37.344 00 <br />$120. (111 <br />$41.280.00 <br />S 115.00 <br />$46,440.00 <br />$140.00 <br />$45,16!1 00 <br />516000 <br />$55.040.01 <br />11 <br />Combined Sawar Pipe. 30 Inch SOR 17 HDPE <br />LF <br />548 <br />$250.00 <br />$153.440.00 <br />$100.01 <br />$164400,00 <br />5375.01 <br />$203,50000 <br />$440,00 <br />$241,120.00 <br />5320.00 <br />$173,16(1.11(1 <br />12 <br />Combined S.wer Pipe, 24 Inch SOR 17 HOPE <br />LF <br />727 <br />5240.00 <br />5174.410.00 <br />5183.00 <br />S 13-3,493.00 <br />$200.00 <br />$145,400010 <br />5150.00 <br />SI N).M1000 <br />5160.011 <br />1116.120.00 <br />3 3 <br />Combined Sew.r Pipe. 24 Inch SDR 17 HOPE. Owner Furnish.d <br />LF <br />219 <br />$201.00 <br />$0.800.00 <br />S7n.00 <br />S I i.1111,00 <br />59300 <br />$19,615,00 <br />S wo'o0 <br />541.610.0( <br />$71,01 <br />$13!987,0() <br />34 <br />Combined Sewer Pipe. 12 Inch SOR 17 HOPE <br />LF <br />82Sl_b000 <br />$16.40(1.0( <br />$173.001 <br />$14.35400 <br />SIX3.00 <br />$13.170.110 <br />$224110 <br />$18,040.00 <br />$128.0) <br />S11)A96.11( <br />Combined Sewer Pipe, 12 Inch Class 53 D1 <br />LF <br />35 <br />S110.00 <br />51,850. <br />5175.00 <br />56.123.00 <br />5200.01 <br />37,()()O.00 <br />$160.00 <br />$3,600.00 <br />$110,00 <br />$4,530,00 <br />36 <br />X -Heavy Coated Steal Casktg, aft Inch. Installed by Auger Bore <br />LF <br />391 <br />S 000.00 <br />$305.100.00 <br />$7(0.0(1 <br />S273.7nn.00 <br />5950.00 <br />5332,150.00 <br />$600.00 <br />$214.600.00 <br />$7,10.00 <br />5304'950.0 <br />37 <br />X -Heavy Steal Casing. 30 Inch. Installed by Auger Bar. <br />LF <br />397 <br />.51,100.00 <br />1416.700.00 <br />$600.01 <br />$239,200,00 <br />$813.60 <br />$1133$5.0 <br />S3$(Ior) <br />$21.9.350.110 <br />$750,00 <br />$277,75(1.011 <br />115 <br />Schedule 20 Steel C-irx., 20 Inch, In.lall.d by Auger Bore <br />LF <br />42 <br />SSnn,O0 <br />111.6(11). <br />SI,5O).01 <br />161,0(X1,(10 <br />575400 <br />131,500.0(1 <br />550).01 <br />531,6(1(1.0 <br />$1,41(1 (111 <br />&ru.7nn.no <br />3g <br />Fabrk;aied 36" SDR 17 HDPE Elbow <br />LS <br />1 <br />$16,000.00 <br />516.00.1 <br />51.000.04) <br />S I 0.01110M <br />$13.11(x1.0!1 <br />$15.000.0) <br />516,0)0.00 <br />516.000.00 <br />$10.00000 <br />$10.00(00 <br />40 <br />T.mfxusry Connection, CSMH OB to Existing CSMH CO <br />LS <br />1 <br />$6.000,00 <br />S6.010.0 <br />$10.000.01) <br />$ 10.000.00 <br />$33.1100.00 <br />$35.010.00 <br />$21,00(1.0(1 <br />521.()00.00 <br />14.100.00 <br />$4.100.00 <br />4I <br />Connection to 14"Fin. 'ce Main <br />LS <br />1 <br />530.00401 <br />550.000.00 <br />$540(10.(10 <br />$50.000.01 <br />5411.010.00 <br />S40.(X)0.00 <br />54X.n00.O0 <br />$45.004()0 <br />$43.00000 <br />$4 i,000.00 <br />42 <br />Connection to Kimberly ClarkOullall <br />LS <br />1 <br />S23.000.00 <br />S25.000.0 <br />$15.000.00 <br />$15.000.0 <br />525000.00 <br />S25.000.00 <br />$40,000.00 <br />540.000.00 <br />$30.000.00 <br />$.30.000.0 <br />43 <br />Elertrical Manhole <br />EA <br />3 <br />$15.01(1.00 <br />S43.000.00 <br />$6,000.00 <br />$18.001.00 <br />".000.00 <br />$12.010.00 <br />$7.0)0.00 <br />S2 1.000.00 <br />$5;000.00 <br />513.000.00 <br />44 <br />Electrical Conduits <br />LS <br />t <br />$10,000.01 <br />S10.000.00 <br />530.00400 <br />$5400000 <br />$63.000.00 <br />$63.000.00 <br />S50.000.00 <br />S80.000.00 <br />$34000.00 <br />$30.000.00 <br />4i <br />Side So-, Conneclfon <br />EA <br />30 <br />$2,500.00 <br />$75,000.00 <br />$2.500.00 <br />S73.000.QO <br />$2500.00 <br />$73,000.00 <br />$4.400.00 <br />5132.000.01 <br />53.600.00 <br />$108,000.00 <br />46 <br />Erosion Control <br />LS <br />1 <br />513.000.(x1 <br />S 15.000.00 <br />59.00400 <br />$50(x).(10 <br />$150(1110(1 <br />$15,0(10.(10 <br />$20.(10).(10 <br />.5110.00.00 <br />$60.00(1.0(1 <br />560.000.00 <br />47 <br />Top -N. Type <br />CY <br />AO <br />$40.00 <br />SG,800.0 <br />51000 <br />S5. 100.00 <br />$4500 <br />$7.630.00 <br />$40.00 <br />S(3.500.00 <br />560.00 <br />SI0?00.00 <br />4g <br />Hydrosinding <br />SY <br />270 <br />51.0) <br />S810.00 <br />$400 <br />5),0110.01 <br />S500 <br />1135(1.0 <br />$6.00 <br />$1,62000 <br />56.00 <br />$1.620.00 <br />,p) <br />Monument Case <br />EA <br />1 <br />$600.00 <br />$600.00 <br />$1,200.00 <br />S1.200.00 <br />S45(.00 <br />5450.00 <br />$604110 <br />$601.01 <br />$550.00 <br />$550.04) <br />3O <br />Connate Skl.walk <br />SY <br />190 <br />$6400 <br />$11400.00 <br />560.00 <br />$11.400.00 <br />56300 <br />$12.134(0 <br />$63.00 <br />512,330.00 <br />S123.00 <br />.$23.150.1X1 <br />31 <br />Concrete Curb <br />LF <br />300 <br />$24.00 <br />S7.200.00 <br />$411.00 <br />$12.(x)0.00 <br />$30.00 <br />S9,000.00 <br />5.10.00 <br />$9.000.00 <br />$70.00 <br />$21.(10(1.00 <br />Curh Ramp. Type C or D <br />EA <br />2 <br />$000.(10 <br />52.600.00 <br />$2.000.00 <br />$4.000.00 <br />$1,63(1.00 <br />$3,10(1.0) <br />51.500.00 <br />$3.000.00 <br />$1,300.00 <br />$7.000.00 <br />. <br />31, <br />Cruah.d Sudacing Top Course <br />TN <br />400 <br />$23.00 <br />S11.200.00 <br />S15.00 <br />56.(x)0.110 <br />548.00 <br />S 19,200.00 <br />$30.00 <br />$12.000.00 <br />533.00 <br />$13.200.00 <br />54 <br />CiishedSurlacingBass Cnurse <br />TN <br />3,700 <br />$28.00 <br />$103.600.00 <br />$15.0) <br />S35.30n.00 <br />$25.00 <br />5103,600,00 <br />$30.00 <br />$111.000.01 <br />$18.00 <br />$166,600.0 <br />Gravel Borrow <br />TN <br />15,000 <br />$18.00 <br />$270.000.00 <br />SIO.00 <br />$ 1 50.0m.00 <br />56.10 <br />$90.00400 <br />524.00 <br />5.160.000.00 <br />512.00 <br />$180.000.1 <br />36 <br />Foundation Material Class A <br />TN <br />500 <br />S28.00 <br />$14.000.00 <br />S10.00 <br />53.001.00 <br />$15.00 <br />$17.500.00 <br />S20.00 <br />$10,000,00 <br />$35.00 <br />517.501.01 <br />3 7 <br />Force Accounl Work <br />LS <br />1 <br />S 100.00 ,00 <br />S100.000.00 <br />S100.000.00 <br />5100.000.01 <br />$ I OO.000.00 <br />5100,000. <br />$101.000.00 <br />S M0,000.00 <br />$100.0(X).00 <br />$100.000.00 <br />115 <br />CSMH 22, Type 2. 72 Inch Diameter <br />LS <br />1 <br />$14.000.00 <br />S14.000.00 <br />$20.000.00 <br />520.00).0(1 <br />S12.i00.On <br />$12.50000 <br />$14,000.00 <br />SI4.000.00 <br />512_,000.00 <br />512001.00 <br />C'nntrnct Tnl.ls: <br />$3.415.245.00 <br />$2.777,63$.00 <br />S3.069.7SO.00 <br />$3,099.M.00 <br />$3.154.113.00 <br />Page 2 of 3 <br />