Laserfiche WebLink
BID TABU[ATI ON <br />Sewer SYstem Rephicement F, Schedule <br />\V,n,fl LIP .1300-1 <br />Dore Rr5/_700?( <br />hwpnred 91." William 13n7re77 <br />Fnr: /hire Ih)/�(, )inject Engineer <br />1*1'1-M <br />it I I"FM DESCRIPTION <br />UNIT QUANTITY <br />ENGINEER'S ESTIMATE <br />UN Il' TOl AL <br />PRICE AMOUNT <br />Plats I'lus <br />UNI -I TO'TA 1. <br />PRICE AMOUNT <br />13DZ Construction <br />UNIT TOTAL <br />PRICE AMOUNT <br />IMCCI Colist ructloll <br />UNIT' TUI -A 1. <br />PRICE AMOUNT <br />SRV Construction <br />UNIT TO I'A 1. <br />PRICE AMOUNT <br />I <br />Mobilization <br />LS <br />1 <br />$175,000.00 <br />$375.000.0 <br />$240.000.00 <br />$2400)400 <br />$125.000.00 <br />S325.000.00 <br />$370.000.00 <br />$170.000.00 <br />$116.000.00 <br />$336.000.0 <br />_ <br />Trrlf9c Control Labor <br />HR <br />1,800 <br />$40.00 <br />372,000.00 <br />$50.00 <br />$90.000.00 <br />$55.00 <br />$99.000.00 <br />545.00 <br />SR 1.000.00 <br />$48.75 <br />S87.750,0 <br />Maintenance and Protection of Traffic <br />LS <br />1 <br />.520,000.00 <br />$20.000.00 <br />520.000.00 <br />$20.000.00 <br />$20.000.00 <br />S20.000.1.10 <br />510.000.00 <br />$10.000.00 <br />$23.000.00 <br />$21.000.0 <br />4 <br />SawcutPavement <br />LF <br />4,300 <br />$2.50 <br />$10,750.00 <br />32.00 <br />58,600.00 <br />$1.00 <br />112,900.00 <br />$1.60 <br />$6.830.00 <br />32.15 <br />510,105.0 <br />j <br />Sawcut Pavement, Additional I`Thickness <br />LF <br />3.100 <br />$0,50 <br />$1,530.00 <br />$0.25 <br />$775.00 <br />$11)0 <br />$3,100.00 <br />50.50 <br />$1.350.00 <br />51.12 <br />$1,472.0 <br />6 <br />Street Cleaning and Sweeping <br />LS <br />1 <br />$14,000.00 <br />$14,000,00 <br />.$12,000.00 <br />517,000.00 <br />8125.00 <br />$125.00 <br />$20.500.00 <br />.$20.500.00 <br />.$11.(100.00 <br />$31,000.0 <br />7 <br />Control Density Fill <br />CY <br />150 <br />5130.00 <br />$22.500.00 <br />$160.00 <br />$24,000.00 <br />$100.00 <br />.$15.000.00 <br />$135,00 <br />$20.250.00 <br />$118,00 <br />$211,70(1.0( <br />g <br />HMA CL 172 -PG 64-22 <br />TN <br />350 <br />S100.00 <br />S13.000.00 <br />$110.00 <br />$45.500.00 <br />$200.00 <br />$70.000.00 <br />5165,00 <br />$57.750.00 <br />$1225.00 <br />$78,750.0( <br />9 <br />Asphalt Treated Base <br />TN <br />150 <br />$too.01 <br />$15,000.00 <br />$160.010 <br />$24.000.00 <br />$200.170 <br />$10,000,00 <br />$110.00 <br />$16,500.0(7 <br />5176.00 <br />$26,400.0 <br />If <br />Pavement Patch (Tamp) <br />TN <br />300 <br />Silo.07 <br />511.000.00 <br />$1407.00 <br />$54,000,00 <br />.S200J)0 <br />$60,000.(1(1 <br />S225oO <br />567,500,00 <br />$31450 <br />$94.350.0( <br />II <br />CSMH F12,Type 1.60Inch Diamel., <br />LS <br />1 <br />517.000.00 <br />$17.000.00 <br />$31.640.(!0 <br />331.640.00 <br />SI5,000.00 <br />.$15.000.00 <br />S3i.000.00 <br />335.000.00 <br />$6-0,1(70.00 <br />564,1040( <br />12 <br />CSMH 01. Type 100Inch Diameter <br />LS <br />1 <br />$11.000.00 <br />$11.000.00 <br />$13,00400 <br />$11.000.00 <br />$28,000.00 <br />$28,0(1(1.0(1 <br />$12.00(.00 <br />$12.000.00 <br />$34.050.00 <br />$34,(150,(7 <br />13 <br />CSMH F9. Typo 1(SO 1nrh Diameter <br />LS <br />I <br />514.000.00 <br />$14.000.00 <br />$10.000.00 <br />$10.000.00 <br />$13.000.00 <br />513.000.00 <br />$131500.017 <br />$I3.50n.00 <br />$19.300.00 <br />$39.3000 <br />4 <br />CSMH F5. Type 1 601nO, DUmnter <br />LS <br />1 <br />$19,00400 <br />$ I R.00400 <br />529.000.00 <br />$29.(100.0(7 <br />530.00400 <br />510.000.00 <br />.510.000.00 <br />$10,000.00 <br />$61.581.00 <br />$61.580.0( <br />1 5 <br />CSMH 02. Type 1, 54 Inch Di -stat <br />LS <br />+ <br />$7.000,00 <br />$7,000.00 <br />$9,504(70$9.300.00 <br />$9.000.00 <br />$9,0(70.(70 <br />$6.50(1.0(1 <br />56.300 00 <br />.517,77 3.00 <br />$1 7,775,0 <br />16 <br />CSMH 03, Type 1. 48 Inch Diameter <br />LS <br />1 <br />$6.000100 <br />$6.000.00 <br />$5.200.00 <br />$5.2(70.(7(1 <br />$4.000.00 <br />$4,000,00 <br />$3.60400 <br />$3,600.0(1 <br />$26.15(1.00 <br />$26.150.0 <br />17 <br />CSMH 08. Type 3, 96 Inch Diamaler <br />LS <br />1 <br />$26.000.00 <br />$26.000.00 <br />$50.000.00 <br />$5o.nno.on <br />$60,000.00 <br />560.00400 <br />$40.000.00 <br />$40.1100,00 <br />$80.100.00 <br />$80.100.0 <br />IS <br />CSMH 09. Type 2. 72 Inch Diameter <br />LS <br />1 <br />$14,000.00 <br />$14.000.00 <br />.S16.000A0 <br />$16.000.00 <br />$7.300.01 <br />$7,500.UO <br />$1(1.000.(117 <br />SI0.)(10.00 <br />$25.100.00 <br />$1_3.100(11' <br />I9 <br />CSMH 10. Type I, 48 Inch Diamaler <br />LS <br />1 <br />$6,000.00 <br />$6.000.00 <br />$6.600.00 <br />S6.600.00 <br />$5,000,07 <br />$5,000.00 <br />$5.000.00 <br />$5.0110.00 <br />S1_1.600A0 <br />$23.604(1( <br />20 <br />CSMH, Typo 3, 72 Inch Dlameler, Constructed within Enluankmanl <br />EA <br />4 <br />$11.0(7000 <br />$44.000.00 <br />39.10400 <br />$17'00.(7(1 <br />$8.000.(1(1 <br />512,000,00 <br />$7,800.00 <br />.$11.200.00 <br />.$',2,45(7.0(1 <br />5129.800,0( <br />21 <br />Concrete mist <br />EA <br />3 <br />53.004.00 <br />56,00101 <br />$1.1_00.00 <br />53.600.00 <br />$1,500.00 <br />$4,500.00 <br />$1,000.00 <br />$3.000,00 <br />51_350.00 <br />S4.(Ii0.0( <br />__ <br />Catch Basin Type B with Gas Trap <br />EA <br />12 <br />,$2,400.00 <br />$78,80(1.0(1 <br />S2.50I0,)O <br />.510.004110 <br />.%2.500,00 <br />,$311,0(7(7.00 <br />52.200.00 <br />$26,400,00 <br />$5,00400 <br />$60,710.01' <br />2i <br />Trench Excavnik)o Safely Systam <br />LS <br />1 <br />.990,000.00 <br />$90,000.00 <br />$175,000.00 <br />.$175.000.00 <br />S300.000.00 <br />$300,000.(1(1 <br />$30,00(.(10 <br />$30.0110,00 <br />$157,0)0.00 <br />$157,000.0( <br />14 <br />Surveying <br />LS <br />1 <br />$20,000,00 <br />$20,000.00 <br />$1 i.000.00 <br />$15,1100.00 <br />.S 15.(1(70.10 <br />515.000.00 <br />$20.(7(111,)(1 <br />.$20,000.00 <br />$1 i,000,00 <br />SI5,000.0( <br />*Combined <br />Sewer Pipe, 38 Inch PS -46 PVC <br />LF <br />212 <br />$284001 <br />559.160,00 <br />S IX0.00 <br />U.S. 160.00 <br />$350.00 <br />$51.000.00 <br />$100,00 <br />$61,600.00 <br />516400 <br />$76,320.0( <br />26 <br />Combined Sewer Pipe. 24 Inch PS. 115 PVC <br />LF <br />420 <br />$30400 <br />$126.000.00 <br />$25(1.(1(1 <br />.S 105,000,00 <br />$400.00 <br />$168,(!00.01 <br />$440,00 <br />$184.800.00 <br />$610.(111 <br />$204,60(1.0( <br />27 <br />Counb4led Sewer Pipe. 24 Inch PS -46 PVC <br />LF <br />188 <br />$200,00 <br />$37,200.(1) <br />$2611.00 <br />$48.360.10 <br />$4517.017 <br />$831.7(1(1.00 <br />5510.00 <br />$94.860.00 <br />Siill.(70 <br />31(12,3010 <br />2g <br />Combined Sawa, a Storm Drain Pip.. 12 Inch SDR 35 PVC <br />LF <br />281 <br />3115.00 <br />$37,915.00 <br />$110.00 <br />$1(7.910.00 <br />$200.10 <br />$56.200.00 <br />$120.00 <br />$33.720,00 <br />$250.00 <br />$70.25(1.17( <br />29 <br />Combined Sewer Pipe. 8 inch SDR 26 PVC <br />LF <br />187 <br />5190.00 <br />$35,510.00 <br />$105.00 <br />$19.615.01 <br />$'_25.0(7 <br />$4:,075.00 <br />$165.00 <br />$10,855.0() <br />S\34(1(1 <br />$61.7140 <br />1) <br />Combined Sewer Pipe a Strom Drain Pip., 8Inch SDR 3.5 PVC <br />LF <br />344 <br />$110.00 <br />517.844(10 <br />$10100 <br />$35,08500 <br />$100.00 <br />53,4.40(7.0(1 <br />$95.00 <br />.$.32,680.00 <br />$305.(70 <br />$104,920.(1( <br />t l <br />Combined Sewer Pip.. 30 Inch SDR 17 HDPE <br />LF <br />548 <br />$281.0(7 <br />$151,44(.00 <br />540400 <br />$1_ 19.20(117(1 <br />$400,00 <br />.$219,200.0(1 <br />.$5(140() <br />.$274.00400 <br />$45ff'00 <br />$250.984 0( <br />311 <br />Combiner) Sewer Pipe, 24 Inch SDR 17 HDPE <br />LF <br />727 <br />$240.00 <br />.S174,480.n( <br />$20400 <br />$145.400.00 <br />5123,01 <br />$91,875,00 <br />.S1_8I7.00 <br />.S243.i60.00 <br />.S115.00 <br />5216,275.0( <br />37 <br />Combin.d Sews Pipe. 241pch SDR 17 HDPE. Ow11.r Furnished <br />LF <br />219 <br />$2(11.01) <br />$41,801.00 <br />$9i.00 <br />$20,805,0 <br />365.1(1 <br />$14.215.(70 <br />SHOW <br />$19,470.0(1 <br />$264.011 <br />S57816.0 <br />314 <br />Combined Sewer Pip., 12 lnch SOR 17 HOPE <br />LF <br />82 <br />5201.01 <br />$16.400 On <br />5162.00 <br />S11.2R4n0 <br />555.00 <br />$4.51401 <br />5140,00 <br />.SI1,80.00 <br />5606.00 <br />$49,692.() <br />315 <br />Combined Sewer Pips, 12 Inch Class 53 01 <br />LF <br />15 <br />$11400 <br />E1\50.00 <br />$200,(7(1 <br />$7.000.(1(1 <br />$110.00 <br />.$1,850.00 <br />$140.00 <br />.$4,900,)0 <br />$120.00 <br />54.20(.0( <br />;0 <br />X -H ... y Coaled Sisal Casing, 36 Inch. Installed by Auger B.I. <br />LF <br />391 <br />$1.1r)n.10 <br />$508,300.00 <br />$7.10.00 <br />$289.340.00 <br />$(10(7.00 <br />$214,600.00 <br />$1,760.00 <br />5633.160.0(1 <br />SSWOO <br />$346:426,1 <br />17 <br />X -Heavy Steel Cae,og. 301nr.h, Iuislistl by Auger Bore <br />LF <br />197 <br />,$1.100,100 <br />$436.700.00 <br />$690.00 <br />$273.910.00 <br />.$700.00 <br />$277,90(1.0(1 <br />$730,01 <br />$289.\1000 <br />$886.0() <br />$351.742.1( <br />}g <br />Sd10.1.20 Slant Coiling. 201oc11. Initialled by Auger B.fa. <br />LF <br />42 <br />$300.00 <br />511.600.00 <br />$900.00 <br />$37,80001 <br />$500.00 <br />$21.000.00 <br />$600.00 <br />$25.200.110 <br />$1!)7(7,00 <br />582,740.01 <br />19 <br />Fabricated 36"SDR 17 HDPE Elb- <br />LS <br />1 <br />.$16.000.00 <br />$16.007.00 <br />$5,000.00 <br />$5,00400 <br />510.010.00 <br />$10.00000 <br />$1,800.00 <br />$3,300.01 <br />$17,670.0() <br />$17.670.(1( <br />40 <br />T.mporary Connection, CSMH 08 to Existing CSMH C9 <br />LS <br />1 <br />$6.000,00 <br />.S6.000.00 <br />315.000.00 <br />$15.(700.0(7 <br />$5.000.)0 <br />$5,000.00 <br />$10.010.00 <br />$10.000.00 <br />$19,8811.00 <br />$19.810.0 <br />41 <br />ConanC000 to 14' Force Main <br />LS <br />1 <br />$50,000.00 <br />$50.000.00 <br />$43.00400 <br />$45.000.0(1 <br />$60.00400 <br />$60.000.00 <br />$70.000.00 <br />$70.000.00 <br />$67.3o0.0o <br />$67.5040( <br />47' <br />Connection to Kimberly Clark Outfall <br />LS <br />1 <br />525.100.00 <br />$25.000,00 <br />$31.000.00 <br />311.100.00 <br />1So.010.00 <br />$507,000.00 <br />$45,(10(1.00 <br />$45,000.00 <br />$42,000.00 <br />$42,000.(11 <br />43 <br />Electrical Manhole <br />EA <br />3 <br />$15.000.00 <br />.$45,000.00 <br />$4.250.00 <br />$1:.75(1.011 <br />$10.000.00 <br />530,000.00 <br />$15,(700.0) <br />$45,000.170 <br />$7,450.00 <br />$22.351.0( <br />44 <br />Electrical ColXluks <br />LS <br />1 <br />$30.000,00 <br />$10,00400 <br />$41.(100,0(1 <br />$40,000.00 <br />.$200.000.00 <br />$200,000.00 <br />$115.000.00 <br />$115,000,)0 <br />$63.50400 <br />S61,i00'0( <br />431 <br />Side S-1Cpnll.clian <br />EA <br />30 <br />$2.300.00 <br />$75.000.00 <br />$1,200.00 <br />$96.000.00 <br />.51,500.10 <br />$45 ,000.00 <br />01 <br />$4.0.00 <br />$120.(100,01 <br />$3,1(10.(1(1 <br />39),000.1( <br />46 <br />Erosion Control <br />LS <br />1 <br />$15.100.00 <br />515.000.00 <br />$15,000.00 <br />- $15.000,00 <br />.$30.000.00 <br />$30.000.00 <br />$10,000.00 <br />510,010.01 <br />.516.000.00 <br />$16.0(1(.(1( <br />47 <br />Topsoil. Type <br />CY <br />170 <br />$40.00 <br />$6.900.00 <br />$75.00 <br />$12.730.00 <br />550.00 <br />38.500.00 <br />$11.00 <br />$3,270.00 <br />SIOR.00 <br />$19.160.Of <br />q8 <br />Hydroaeedkng <br />SY <br />270 <br />$100 <br />$910.00 <br />$5.00 <br />51.350,00 <br />$5,10 <br />$1.350.00 <br />510.00 <br />$2,700.00 <br />510.00 <br />52,70.0( <br />49 <br />MOnllmenl Caae <br />EA <br />1 <br />$610.00 <br />$600.00 <br />$1450.00 <br />$1.45400 <br />$600.00 <br />$60400 <br />$1.000.00 <br />$1.00410 <br />5900.00 <br />5900.0( <br />310 <br />Concrete Sidewalk <br />SY <br />190 <br />560.07 <br />S11,400.0(1 <br />$80.00 <br />$15,200.00 <br />$70.00 <br />$13300.00 <br />555.00 <br />$1(1,450.00 <br />$96.00 <br />$16.1411,1 <br />51 <br />Concrete Curb <br />LF <br />300 <br />$24.00 <br />$7.200.00 <br />550.00 <br />$15.00),70 <br />$40.00 <br />.S I2.000.on <br />335.01 <br />510,500.00 <br />S53.00 <br />$I6j(!0.(1 <br />52 <br />Curb Ramp, Type C or O <br />EA <br />2 <br />$1.300.00 <br />$2.60400 <br />- $1.50400 <br />$1,00400 <br />$3.000.00 <br />.$4,0(1(1.00 <br />$1,710.00 <br />$3,410.00 <br />.$2,430.00 <br />$4.860.0 <br />Crushed Sudacing Top Co,rs. <br />TN <br />400 <br />S2R.00 <br />$11.20).00 <br />$28.5(1 <br />$11.401.01 <br />.550.07 <br />S_20.000.00 <br />.515,00 <br />,$19000.00 <br />538.0(1I)(),()( <br />34 <br />Crushed Surfacing Baas Course <br />TN <br />3,700 <br />$2.1,00 <br />$103,600.00 <br />.$29.511 <br />$105,45400 <br />$45.(1(1 <br />.$166,500.00 <br />$15.00 <br />$129,io000 <br />V1.00 <br />$114,700.01, <br />5i <br />Gravel Borrow <br />TN <br />15,000 <br />SIR.UO <br />$274000,00 <br />$26.00 <br />$190,004,00 <br />$25,0(1 <br />S175,OIID.00 <br />$19.00 <br />5270,0011.00 <br />S29.Of1 <br />8433,000.0( <br />56 <br />Foundilion Malarial Col.. A <br />TN <br />5(70 <br />$28,(70 <br />$14,000.0() <br />$5000 <br />3_15.(10(1.( <br />$611.00 <br />$10.00(1,1(1 <br />$1i.00 <br />$17.i0400 <br />,558,00 <br />S29,000,0 <br />57 <br />Force Account Work <br />LS <br />+ <br />$ I 0.010.00 <br />S 100.000,00 <br />$100.00400 <br />S I00.000.On <br />$ l oo,1o0,0n <br />S 100.000.00 <br />$100,000-00 <br />$100.000,00 <br />.S 100.000.00 <br />$10(1.1700.0( <br />5g <br />CSMH 22. Type 2. 72 InchDiamel.r <br />LS <br />1 <br />$14.000.00 <br />$14.00400 <br />.$18.501.00 <br />S 18.500.00 <br />$7.080.00 <br />$7.08400 <br />$12.0(7(.00 <br />.$12.001.0(7 <br />.S24,000.00 <br />$24,(1(11.0( <br />Cnntracl To W': <br />$1415,24i.00. <br />$3.211,1,77.00 <br />$1,660,000.00 <br />$.1.890,295.00 <br />$4,613.487.00 <br />Page 3 of 3 <br />