My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/08/20 Council Agenda Packet
>
Council Agenda Packets
>
2008
>
2008/08/20 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2017 9:03:23 AM
Creation date
3/27/2017 11:48:09 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/20/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br />Section 2: Conditions of Approval. <br />1. Exhibits A, B, C-1, C-2, C-3, D, E and F are hereby made part of this approval and <br />incorporated herein by reference. <br />2. Building heights and setbacks shall be in accordance with the building area height map <br />found at Exhibit E. <br />3. Any development standard not specified in this Ordinance, or the previous two Master <br />Plan Ordinances for ECC, specifically Ordinance 2232-97 and Ordinance 2849-05 shall be <br />determined by applicable underlying zone for the given location within the Master Plan area, as <br />found in the Everett Zoning Code, Title 19. <br />4. ECC shall continue to provide off-street parking and access improvements <br />5. Principal access to the campus shall be taken from Broadway and North Broadway over <br />the long term. <br />6. New construction in the expansion area established herein shall to the extent feasible be. <br />compatible with surrounding areas and uses. <br />7. The 2015 Master Plan shall be revised within one year of that time, or the application for <br />such revision shall be in process and under review. <br />8. ECC is encouraged to work with the surrounding neighborhoods at important steps <br />throughout the campus development process. Such contacts shall be undertaken by the College <br />at no less frequent interval than the beginning period of each listed phase, as indicated in <br />Exhibits C-1, C-2, C-3. <br />9. A construction mitigation plan appropriate for the next phase of construction, or major <br />campus building project will be submitted prior to each new phase of construction. These <br />mitigation plans will be provided to City Council for its information. <br />Section 3: Legal Description. <br />The legal description of the area subject to the rezone and Comprehensive Plan amendment is set <br />forth in Exhibit F of this Ordinance. <br />Section 4: Validity. <br />Should any section, subsection, paragraph, sentence, clause or phrase set forth in this Ordinance <br />or its application to any person or situation be declared unconstitutional or invalid for any reason, <br />such decision shall not affect the validity of the remaining portions of this Ordinance or its <br />application to any other person or situation. The City Council of the City of Everett hereby <br />2`Q: <br />
The URL can be used to link to this page
Your browser does not support the video tag.