Laserfiche WebLink
5 <br />2.6 Pedestrian bridge and bridge wing over 13th Street. <br />2.7 Any uses which are ancillary to the above uses. <br />2.8 Temporary parking, construction staging, material storage as provided in <br />Section 3.9 of this master plan <br />3.0 Development Standards. <br />3.1 Gross Floor Area of Development (excluding parking garages and below - <br />grade development): 850,000 square feet. <br />3.2 Phasing: The property shall be developed in phases in accordance with the <br />following anticipated schedule, provided the City may approve revisions in <br />the phasing of uses on the property as provided by EMC 15.16.080.A(24): <br />Phase 1: Utility Plant (approximately 50,000 square feet), which shall be <br />located in the 85 foot height zone, pedestrian bridge over 13th <br />Street, and utility corridor under 13th Street, by 2011. <br />Phase 2: Clinic, Medical -Related Activities, and Hospital (e.g. hospice) <br />Facilities — in northern 45 foot height zone and eastern 75 foot <br />height zone — 2009 to 2025 (approximately 300,000 square feet). <br />Phase 3: Hospital, Clinic, and Medical -related Facilities — in 175 foot zone <br />— 2020 to 2030 (approximately 500,000 square feet, including <br />bridge over 13th Street connecting the hospital towers on the Colby <br />Campus and ECC Property). <br />All Phases: Surface and structured parking shall be included, as required, in <br />each Phase. <br />PEMC shall, every two years, or when a specific development is anticipated, <br />provide the Planning Director and City Council with an update on planned future <br />development for the ECC Property. <br />21 <br />