Laserfiche WebLink
5 <br />3.10.5 Sound baffling will be provided for generator air intake and <br />discharge. <br />3.10.6 PEMC will perform quarterly noise and air monitoring of the <br />Utility Building for one full year following commencement of <br />Utility Building operations in accordance with monitoring <br />protocols prepared by qualified acoustical and emissions <br />engineers and submitted to the Director of Planning for <br />approval. If such monitoring shows failure to comply with any <br />required governmental standard, PEMC must present to the <br />Director of Planning a plan to immediately bring the operations <br />into compliance with applicable codes. <br />3.10.7 The design of the Utility Building will be reviewed by the <br />Design Review Committee. <br />3.11 Construction Mitigation: <br />3.11.1 PEMC will restrict construction activity from 7:00 a.m. to <br />6:00 p.m. weekdays and 8:00 a.m. to 6:00 p.m. on weekends, <br />unless otherwise specifically authorized by the Planning <br />Director. <br />3.11.2 PEMC will submit.a Construction Mitigation Plan prior to each <br />new phase of construction. <br />3.12 Master Plan Graphics: See the following attached Figures pertaining to the <br />phasing and development standards of the Master Plan. Internal boundaries <br />between phases and height zones are approximate, but must be reasonably <br />consistent with the boundaries shown in the attached figures. The Planning <br />Director shall determine consistency with these boundaries during the review of <br />each phase of development; and shall have the authority to determine if any <br />change in boundary constitutes a Major Change or Minor Revision as provided in <br />Section E. <br />27 <br />