My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10412 ROSEWOOD AVE ROSEWOOD PARK WHOLE SITE DEVELOPMENT 2017-04-07
>
Address Records
>
ROSEWOOD AVE
>
10412
>
ROSEWOOD PARK WHOLE SITE DEVELOPMENT
>
10412 ROSEWOOD AVE ROSEWOOD PARK WHOLE SITE DEVELOPMENT 2017-04-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2017 7:37:36 PM
Creation date
3/27/2017 1:38:10 PM
Metadata
Fields
Template:
Address Document
Street Name
ROSEWOOD AVE
Street Number
10412
Tenant Name
ROSEWOOD PARK WHOLE SITE DEVELOPMENT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
465
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e. Describe the purpose, type and approximate quantiries of any filling or <br />grading proposed. Indicate source of fill. <br />Cut,'�/�roCY <br />Fill: ,r� CY <br />Source of fill: onsite. Driveway and foundaHons soiLc may be <br />imported from a commercial bonow pit in the area <br />f. Could eresion occur as a result of clearing, construction, or use? If so, <br />generally describe. <br />Erosion may occur from clearing, road and building construction; <br />ero�ion prevention measures will prevent t6e majority of this. <br />g. About what pement of the site will be covered with impervious surfaces <br />after project construcdon (for example, asphalt or buildings)? <br />42% <br />h. Proposed measures to reduce or control erosion, or other impacts t� the <br />earth, if any: <br />Standard erosion control measures as required by Snohomis6 County. <br />2. Air <br />a. What types of emissions to the air would result from the proposal (i.e.. <br />dust, automobile odors, industrial wood smoke) during construction and <br />when the project is completed? If any, generally describe and give <br />approximate quantities if known. <br />Dust and construction equipment ezhsust during construcHon. <br />Automobile ezhaust and smoke from wood fires in fire places <br />following construction. <br />b. Are there any off-site sources of emissions or odor that may ati'ect your <br />proposal? If so, generally describe. <br />No <br />c. Proposed measures to reduce or control emissions or other impacts to <br />air, if any: <br />Dust will he cor�bated with the application of water if neccvsary. <br />Water <br />a. Surface <br />1) Is there any surface water body on or in the immediate vicinity of the <br />site (including year-rornd and seasonal streams, saltwater, lakes, ponds, <br />wedands)? If yes, describe type and provide names. If appropriate, state <br />what siream or river it flows into. <br />Category III wetlands snd a Type 4 stream exists on-site. It flows into <br />Swamp Creek <br />5/,6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.