Laserfiche WebLink
b. List any threatened or endangered species known to be on or neaz the <br />site. <br />none <br />c. Is the site part of a migration route? If so, explain. <br />No <br />d. Proposed measures :o preserve or enhance wildlife, if any: <br />Preservstion of wetlsnd/stream c�rridor. <br />6. Energy and Natural Resources <br />a What kinds of energy (electric, natural gas, oif, wood stove, solar) will <br />be used to meet the completed project's energy needs? Describe whether <br />it will be used for heating, manufacturing, etc. <br />Electric <br />b. Would yo� project affect the potential use of solar energy by adjacent <br />properties? If so, generally describe. <br />t+io <br />c. W6at kinds of energy conservation features are included in the plans of <br />this proposal? List other proposed measures to reduce or control energy <br />impacts, if any: <br />Standard conservation features required by Snohomish County <br />Environmental Health <br />a Are there any environmental health hazards, including exposure to <br />toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that <br />could occur as a result of this proposal? If so, describe. <br />N/A <br />I) Describe special emergency services that might be required. <br />N/A <br />2) Proposed measures to reduce or control env'vonmental health ha�ards, <br />if any: <br />N/A <br />b. Noise <br />1) What types of noise exist in the area which may affect your project (for <br />example: traf6c, equipment, operation, aircraft, other)? <br />Traffic noise from adjacent street; aircraft noise from Paine Field <br />��0 <br />