My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2034-95
>
Ordinances
>
Ordinance 2034-95
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2017 9:21:18 AM
Creation date
3/28/2017 9:21:01 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2034-95
Date
1/4/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. The report shall include a record of the concentrations (and mass if specified in the <br /> wastewater discharge permit) of the pollutants listed in the wastewater discharge <br /> permit that were measured and a record of all flow measurements (average and <br /> maximum) taken at the designated sampling locations, and shall also include any <br /> additional information required by this ordinance or the wastewater discharge <br /> permit. Production data shall be reported if required by the wastewater discharge <br /> permit. Both daily maximum and average concentration (or mass, where required) <br /> shall be reported. <br /> If a user sampled and analyzed more frequently than what was required by the <br /> City or by this ordinance, using methodologies in 40 CFR Part 136, it must submit <br /> all results of sampling and analysis of the discharge during the reporting period. <br /> C. Any user subject to equivalent mass or concentration limits established by the City <br /> or by unit production limits specified in the applicable categorical standards, shall <br /> report production data as outlined in Section 4.2 (B) of this ordinance. <br /> D. Zero discharge users shall submit periodic reports as required by the Director <br /> stating that no process waste has been discharged to the POTW. <br /> E. If the City calculated limits to factor out dilution flows or non-regulated flows, the <br /> user will be responsible for providing flows from the regulated process flows, <br /> dilution flows and non-regulated flows. <br /> F. Flows shall be reported on the basis of actual measurement; provided, however, <br /> that the City may accept reports of average and maximum flows estimated by <br /> verifiable techniques if the City determines that an actual measurement is not <br /> feasible. <br /> G. Sampling shall be representative of the user's daily operations and shall be taken in <br /> accordance with the requirements specified in Section 5 of this ordinance. <br /> H. The City may require reporting by users that are not required to have an industrial <br /> wastewater discharge permit if information or data is needed to establish a sewer <br /> charge, determine the treatability of the effluent or determine any other factor <br /> which is related to the operation and maintenance of the sewer system. <br /> The City may require self-monitoring by the user or, if requested by the user, may <br /> agree to perform the periodic compliance monitoring needed to prepare the <br /> periodic compliance report required under this section. If the City agrees to <br /> perform such periodic compliance monitoring, it may charge the user for such <br /> monitoring, based upon the costs incurred by the City for the sampling and <br /> analyses. Any such charges shall be added to the normal sewer charge and shall be <br /> payable as part of the utility bills. The City is under no obligation to perform <br /> periodic compliance monitoring for a user. <br /> 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.