Laserfiche WebLink
(b) There were no feasible alternatives to the bypass, such as the use of <br /> auxiliary treatment facilities, retention of untreated wastes, or <br /> maintenance during normal periods of equipment downtime. This <br /> condition is not satisfied if adequate back-up equipment should <br /> have been installed in the exercise of reasonable engineering <br /> judgment to prevent a bypass which occurred during normal <br /> periods of equipment downtime or preventive maintenance; and <br /> (c) The user submitted notices as required under paragraph (C) of this <br /> section. <br /> (2) The POTW may approve an anticipated bypass, after considering its <br /> adverse effects, if the POTW determines that it will meet the three <br /> conditions listed in paragraph (D)(I) of this section. <br /> 49 <br />