My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4492
>
Resolutions
>
Resolution 4492
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 11:35:32 AM
Creation date
3/30/2017 11:35:15 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
4492
Date
10/1/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pedestrian Interpretive trails <br /> * Locate a trail adjacent to Narbeck Creek, starting from its wetland headwaters on the <br /> Fluke Manufacturing Company property to the east-west trail along Mukilteo Boulevard. <br /> Standards for environmentally sensitive areas would apply. <br /> * Develop an interpretive trail around the 15 acres of wetland in the Narbeck Creek <br /> drainage. <br /> * Locate a trail adjacent to Powdermill Creek, extending form Seaway Boulevard to <br /> Mukilteo Boulevard, where the creek goes under a bridge and flows down to Port Gardner. <br /> Standards for environmentally sensitive areas would apply. <br /> * Work with Boeing to provide a pedestrian exercise/nature loop trail around their facility <br /> for employees and visitors. <br /> * Study all proposed trails for neighborhood connections. <br /> Bicycle trails <br /> * Provide a direct, preferably separated commuter bicycle route from the Interurban Trail in <br /> the I-5 corridor to the industrial complex. This could be achieved through road <br /> improvements to Highway 526 as mitigation. <br /> * Develop a bicycle/pedestrian trail along the abandoned Great Northern Railroad track <br /> alignment, which runs along the length of Japanese gulch and link Seaway Boulevard to <br /> Mukilteo Boulevard. The trail could be extended south through the Boeing property, to <br /> connect with the existing trail along West Casino Road. <br /> * Extend the existing trails along West Casino Road westward to 44th Avenue SW, 526 <br /> and connecting with Highway 525 (Mukilteo Speedway). <br /> * Designate Merrill Creek Parkway as a bicycle route with the intention of adding bicycle <br /> lanes at a future date when the road undergoes a major repair effort. Continue the bicycle <br /> route to the Seaway Boulevard, connecting with existing bicycle lanes along West Casino <br /> Road. <br /> * Provide bicycle lanes along Hardeson Road and add signalized crosswalks where <br /> appropriate in order to cross this heavily used industrial road. <br /> * Extend the existing bicycle/pedestrian lane along Mukilteo Boulevard from Howarth Park <br /> to its intersection with Highway 525 in the City of Mukilteo. <br /> * Coordinate with the City of Mukilteo to develop bicycle lanes along Highway 525 <br /> (Mukilteo Speedway)to facilitate access to and from the Mukilteo ferry dock. Connect this <br /> trail with bicycle lanes along Mukilteo Boulevard, as extended from Howarth Park. <br /> * Require bicycle lanes on newly constructed roadways providing further access to the <br /> industrial area. <br /> Cross Country Skiing Trails <br /> * Designate the Japanese gulch trail to serve also as a winter use cross country skiing trail. <br /> W:\PLANNING\TRAILS\COMP96.DOC 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.