My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4457
>
Resolutions
>
Resolution 4457
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 12:09:01 PM
Creation date
3/30/2017 12:08:41 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
4457
Date
7/2/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM, 1998 TO 2003 <br /> Agency: City of Everett <br /> City No.: 0420 Hearing Date Pp 7 <br /> County No.: 31 Adoption Date <br /> MPO: PSRC LOCAL ACCESS Resolution No. <br /> F P PROJECT IDENTIFICATION I STU PROJECT COSTS IN THOUSANDS OF DOLLARS <br /> U r m t o L t FUNDING SOURCE INFORMATION FEDERALLY <br /> N 1 A. FEDERAL AID ROUTE NO. p a t e i C FEDERAL FUNDING EXPENDITURE SCHEDULE FUNDED <br /> C C o B. BRIDGE NO. r T t a n 1 o PROJECT MONTH/ Federal Federal RAP STATE LOCAL TOTAL (Local Agency) PROJECTS <br /> T 1 r C. PROJECT TITLE o y u 1 g i d PHASE YEAR Cost Fund CAPP FUNDS FUNDS FUNDS 4th, ENVIR. R/W <br /> Na i N D. STREET/COUNTY ROAD NAME OR NUMBER v p s t t e PHASE By Code TIA lot 2nd 3rd 5th, TYPE REQ. <br /> Ls t o E. TERMINAL BEGINNING AND END . e h y a STARTS Phase DATA 6th Y/N <br /> • Y . F. DESCRIBE WORK TO BE DONE _ OTHER DATE <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 10 19 20 21 <br /> 19 10 A. VARIOUS ROUTES 12 00 00 PE 1/98• EIS: <br /> B. N/A F R/W CE: <br /> C. INTERIM TRAFFIC SIGNALS CONST 6/98' EA: DATE: <br /> D. VARIOUS LOCATIONS WITHIN THE CITY LIMITS TOTAL 900 900 150 150 150 450 N/A: <br /> E. IBID. <br /> P. CONSTRUCT INTERIM SIGNALS — <br /> 19 11 A. 2783,2781,2791 12 00 C 'PE 3/98• _ EIS: <br /> B. N/A 14 F P R/W _ CE: <br /> C. DEVELOPER SIGNALS T CONST 10/98' EA: DATE: <br /> D. MERRILL CRR./SEAWAY&HARDESON; ETC. TOTAL 600 600 600 N/A: <br /> E. IBID. <br /> F. CONSTRUCT SIGNALS <br /> 19 12 A. 2715,2795,2797,0099,2777, ETC. 12 F 00 C PE 2/99• EIS: <br /> B. N/A 06 G P R/W CE: <br /> C. NES PROJECTS 32 S T CONST 8/99' _ EA: DATE: <br /> D. 15TH 6 E. M. VIEW DR.; EVERETT MALL WAY ACCESS RESTRICTIONS: TOTAL 55 555 250 255 N/A: <br /> EXPOSED BRIDGE ENDS; BROADWAY 6 18TH PED SIGNAL, ETC. <br /> E. IBID. <br />' F. HAZARD ELIMINATION AND SAFETY PROJECTS <br /> 19 13 A. VARIOUS ROUTES 12 00 00 PE EIS: <br /> B. N/A 06 P R/W CE: <br /> C. ROADWAY HAZARD ELIMINATION CONST 6/98' EA: DATE: <br /> D. VARIOUS LOCATIONS TOTAL 120 120 20 20 20 60 N/A: <br /> E. IBID. <br /> F. REMOVE AND/OR MODIFY ROADSIDE HAZARDS <br /> 19 14 A. VARIOUS ROUTES 31 00 00 PE 2/98• EIS: <br /> B. N/A P R/W CE: <br /> C. NEIGHBORHOOD TRAFFIC STUDIES CONST EA: DATE: <br /> D. PORT GARDNER, NORTHWEST, AND OTHERS TOTAL 70 70 70 N/A: <br /> E. IBID. <br /> F. STUDY TRAFFIC TRENDS, RECOMMEND IMPROVEMENTS <br /> 19 15 A. N/A 32 F, 00 P PE 11/97• 50 CMAQ EIS: YES <br /> B. N/A 12 S, 0 R/W 3/98' CE: X <br /> C. NORTHERN EXTENSION OF INTERURBAN TRAIL, STAGE II 6 CONST 8/99• 400 CMAO EA: DATE: <br /> D. COMMERCIAL AVENUE, PUD R/W, COLBY AVENUE P TOTAL 450 150 600 570 N/A: 3/98 <br /> E. MADISON STREET TO 41ST STREET <br /> F. DESIGN AND CONSTRUCT PEO/BIKE PATH <br /> 19 16 A. N/A 32 F, 00 P PE 5/97 84 CMAQ EIS: YES <br /> 8. N/A 12 S, 0 R/W 3/99' _ CE: X <br /> C. RIVERSIDE WALKWAY, PHASE II 6 CONST 7/2000• EA: DATE: <br /> D. PACIFIC AVE., E.GRAND, E. MARINE VIEW DR. P TOTAL 84 93 684 40 560 N/A: 3/98 <br /> E. PACIFIC AND SMITH TO N. BROADWAY <br /> F. DESIGN AND CONSTRUCT PED/BIKE PATH <br /> 19 17 A. VARIOUS ROUTES 32 F, 00 P PE 5/98' EIS: <br /> B. N/A 12 S, 0 R/W 10/98' CE: <br /> C. EVERETT NONNOTORIZED TRAIL SYSTEM 6 <br /> E CONST 9/99• EA: DATE: <br /> D. VARIOUS LOCATIONS P TOTAL 600 600 100 100 100 300 N/A: <br /> E. IBID. <br /> F. DESIGN AND CONSTRUCT PED/BIKE PATHS, BIKE LANES <br /> 19 18 A. 0099, 0529, 2791, 2776, 2777, ETC. 06 00 00 PE 3/98' EIS: <br /> B. N/A 17 P R/W CE: <br /> C. CITY ENTRYWAY LANDSCAPING AND SIGNS CONST 7/98• EA: DATE: <br /> D. VARIOUS ENTRYWAY CORRIDORS W/IN CITY LIMITS TOTAL 150 150 25 25 25 75 N/A: <br /> E. IBID. <br /> F. SPECIAL LANDSCAPING AND SIGNS FOR CITY'S ENTRYWAYS <br /> 'A portion or all of the funding for these projects has not yet been committed. <br /> NOTE: 'Local Funds' include City of Everett, Snohomish County, and/or Port of Everett funds contributed or tentatively contributed to the projects. <br />
The URL can be used to link to this page
Your browser does not support the video tag.