My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 4457
>
Resolutions
>
Resolution 4457
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 12:09:01 PM
Creation date
3/30/2017 12:08:41 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
4457
Date
7/2/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM, 1998 TO 2003 <br /> Agency: City of Everett <br /> City No.: 0420 Hearing Date __ Pg 6 <br /> County No.: 31 Adoption Date - <br /> N PO: PSRC LOCAL ACCESS Resolution No. <br /> F P PROJECT IDENTIFICATION I STU PROJECT COSTS IN THOUSANDS OP DOLLARS <br /> U m t o L t FUNDING SOURCE INFORMATION FEDERALLY <br /> N i A. FEDERAL AID ROUTE NO. p 0 6 C FEDERAL FUNDING EXPENDITURE SCHEDULE FUNDED <br /> C C o B. BRIDGE NO. r T t anloPROJECT MONTH/ Federal Federal RAP STATE LOCAL TOTAL (Local Agency) PROJECTS <br /> T 1 r C. PROJECT TITLE o y u 1 g i d PHASE YEAR Cost Fund CAPP FUNDS FUNDS FUNDS 4th, ENVIR. R/W <br /> Ns I N D. STREET/COUNTY ROAD NAME OR NUMBER V p s t t e PHASE By Code TIA 1st 2nd 3rd 5th, TYPE REQ. <br /> L• t o E. TERMINAL BEGINNING AND END . e h y s STARTS Phase UATA 6th Y/N <br /> • y . F. DESCRIBE WORK TO BE DONE _ _ OTHER DATE <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 19 1 A. VARIOUS ROUTES 03 00 0 PE 1/98 EIS: No <br /> B. N/A F R/W CE: X <br /> C. ANNUAL STREET OVERLAY PROGRAM c CONST 7/98 700 STP (U) EA: DATE: <br /> D. VARIOUS STREETS WITHIN THE CITY LIMITS S TOTAL 700 2110 2810 405 405 500 1500 N/A: <br /> E. IBID. <br /> - <br /> F. STREET RESURFACING <br /> 19 2 A. VARIOUS ROUTES 06 00 C PE 3/92 _ EIS: <br /> B. N/A 12 F T R/W CE: <br /> C. NEIGHBORHOOD TRAFFIC MITIGATION PROJECTS P CONST 5/93 _ EA: DATE: <br /> D. VARIOUS LOCATIONS WITHIN THE CITY LIMITS 0 TOTAL _ 2083 2083 600 N/A: <br /> E. IBID. _ <br /> F. INSTALL TRAFFIC ENHANCEMENTS IN NEIGHBORHOODS _ <br /> 19 3 A. N/A 06 00 PE EIS: <br /> B. N/A 12 F R/W 2/94 CE: <br /> C. BOEING MITIGATION PARK AND RIDE LOT PROJECTS 21 CONST 5/94 _ EA: DATE: <br /> D. VARIOUS LOCATIONS INSIDE AND OUTSIDE CITY LIMITS TOTAL _ 1537 1537 200 200 200 400 y_/A:___ <br /> E. IBID. _ <br /> F. ESTABLISH P/R LOTS TO SERVE SW EVERETT COMMUTERS <br /> 19 4 A. VARIOUS ROUTES 06 00 00 PE 1/98• EIS: <br /> B. N/A 12 P 11/W CE: <br />' C. PEDESTRIAN IMPROVEMENTS CONST 6/98• EA: DATE: <br /> D. VARIOUS LOCATIONS WITHIN THE CITY LIMITS TOTAL 300 300 50 50 50 150 N/A: <br /> E. IBID. <br /> P. DESIGN AND CONSTRUCT NEW AND REHAB EXISTING SIDEWALKS, PATHWAYS, CURB RAMPS <br /> 19 5 A. 2728 06 00 00 PE 1/98• EIS: <br /> B. N/A 12 F R/W CE: <br /> C. 12TH STREET PEDESTRIAN IMPROVEMENTS CONST 6/98• EA: DATE: <br /> D. 12TH STREET TOTAL OTHER 70 31 101 101 N/A: <br /> E. RAINIER AVENUE TO POPLAR STREET _ <br /> F. DESIGN AND CONSTRUCT NEW AND REHAB OLD PED FACILITIES <br /> 19 6 A. 2780 06 00 00 PE 1/98• EIS: <br /> I B. N/A 12 F R/N CE: <br /> C. MADISON STREET SIDEWALKS CONST 6/98• _ EA: DATE: <br /> D. MADISON STREET TOTAL _OTHER 12 8 16 16 N/A: <br /> E. HIGHLAND DRIVE TO SOUTH BROADWAY <br /> P. DESIGN AND CONSTRUCT NEW SIDEWALKS AND CURB RAMPS <br /> 19 7 A. VARIOUS ROUTES 06 00 00 PE 1/98• EIS: NO <br /> B. N/A 12 S R/W CE: X <br /> C. NEIGHBORHOOD BLOCK GRANT PROJECTS CONST 5/98• 360 OTHER EA: DATE: <br /> D. VARIOUS LOCATIONS WITHIN THE CITY LIMITS TOTAL 360 360 60 60 60 180 N/A: <br /> E. IBID. <br /> F. CONSTRUCT PUBLIC IMPROVEMENTS IN NEIGHBORHOODS <br /> 19 8 A. VARIOUS ROUTES 12 00 C PE EIS: NO <br /> B. N/A F P R/W CE: X <br /> C. SIGNAL MASTER 4 INTERCONNECT T CONST 5/97• 315 STP(U) 500 815 75 75 75 225 EA: DATE: <br /> D. VARIOUS LOCATIONS WITHIN THE CITY LIMITS TOTAL 315 N/A: <br /> E. IBID. <br /> F. DESIGN 6,CONSTRUCT INTERCONNECTN UPGRADE SIG. MASTER <br /> 19 9 A. VARIOUS ROUTES 12 00 00 PE 1/98• EIS: <br /> B. N/A P R/W CE: <br /> — <br /> C. PAVEMENT MARRING PROJECTS CONST 5/98• EA: DATE: <br /> D. VARIOUS LOCATIONS WITHIN THE CITY LIMITS TOTAL 480 480 80 80 BO 240 NA: <br /> E. IBID. <br /> F. INSTALL PAVEMENT MARKING IN VARIOUS LOCATIONS <br /> •A portion or all of the funding for theme projects has not yet been commdtted. <br /> NOTE: 'Local Pund•• include City of Everett, Snohomish County, and/or Port of Everett funds contributed or tentatively contributed to the projects. <br /> i1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.