Laserfiche WebLink
SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM, 1998 TO 2003 <br /> Agency: City of Everett <br /> City No.: 0420 Hearing Date Pg 1 <br /> County No.: 31 Adoption Date <br /> MPO: PSRC INTERSTATES AND FREEWAYS Resolution No. <br /> F P PROJECT IDENTIFICATION I S T U PROJECT COSTS IN THOUSANDS OF DOLLARS <br /> U [ m t o L t FUNDING SOURCE INFORMATION FEDERALLY <br /> N I A. FEDERAL AID NO. p1 C a FEDERAL FUNDING EXPENDITURE SCHEDULE FUNDED <br /> C C o B. BRIDGE NO. r T [ an1oPROJECT MONTH/ Federal Federal RAP STATE LOCAL TOTAL (Local Agency) PROJECTS <br /> T 1 r C. PROJECT TITLE o y u 1 g 1 d PHASE YEAR Cost Fund CAPP FUNDS FUNDS FUNDS 4th, ENVIR. R/W <br /> N a 1 N D. STREET/COUNTY ROAD NAME OR NUMBER v p s t t e PHASE By Code TIA 1st 2nd 3rd 5th. TYPE REQ. <br /> Ls t o E. TERMINAL BEGINNING AND END . e h y e STARTS Phase DATA 6th Y/N <br /> s y . F. DESCRIBE WORK TO BE DONE OTHER DATE <br /> 1 2 3 4 5_ 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 11 1 A. 0005 03 8.0 0 PE 9/98 1000 STP EIS: X No <br /> B. VARIOUS 04 P R/N 125 125 1250 400 B00 CE: <br /> C. INTERSTATE 5 CORRIDOR IMPROVEMENT STUDY 06 CONST EA: DATE: <br /> D. I-5 L 112TH ST., 41ST ST., SR 526. PACIFIC AVE., SR 2. E. M. V. DR.. 12TH ST. 08 TOTAL 1000 N/A: <br /> E. 112TH ST. TO 12TH ST. 09 <br /> F. DESIGN REPORT AND ENVIRONMENTAL REVIEW. I-5 CORRIDOR IN EVERETT 12 <br /> 12 2 A. 0526 08 0.2 0 PE 4/96 157.5 STP EIS: YES <br /> B. 526/18 04 F R/W OTHER 500 1500 2000 1900 CE: X <br /> C. SR 526/EVERGREEN WAY OVERCR05SING 06 CONST 8/96 892.5 STP EA: DATE: <br /> D. SR 526 AND EVERGREEN WAY 12 TOTAL 1050 ''', .- <br /> E. EVERGREEN WAY OVERCROSSING <br /> F. DESIGN AND CONSTRUCT WIDENING OF OVERCROSSING <br /> 11 3 A. 0005 05 5.6 0 PE 3/93 EIS: <br /> B. N/A 06 P R/N 10/95 OTHER 32656 32656 9002 1998 CE: <br /> C. I-5 MEDIAN HOV LANES; 164TH HOV I/C; MEDIAN REVEG. 12 CONST 7/96 EA: DATE: <br /> D. INTERSTATE 5 TOTAL N/A: <br /> E. 164TH STREET S.E. TO SR 526 <br /> F. DESIGN AND CONSTRUCT MEDIAN NOV LANE SYSTEM <br /> 11 4 A. 0005 05 5.6 0 PE 8/98' EIS: YES <br /> B. N/A 06 P R/W 8/2001' OTHER 70000 70000 1800 68200 CE: <br /> C. I-5 NOV LANES 12 CONST 2/2002' EA: X DATE: <br /> D. INTERSTATE 5 TOTAL N/A: <br /> E. SR 526 TO SR 2 2001 <br /> F. DESIGN AND CONSTRUCT MEDIAN NOV LANES <br /> 11 5 A. 2776, 0005 03 0.3 0 PE 8/99' _ EIS: <br /> 14 B. 5/630 05 P R/W 8/2001' OTHER 8000 8000 500 7500 CE: <br /> C. I-5/41ST STREET INTERCHANGE AND AUXILIARY LANE 10 CONST 2/2002' EA: DATE: <br /> D. 41ST STREET L I-5 TOTAL N/A: <br /> E. 41ST STREET OVERCROSSING AT INTERSTATE 5; I-5. 41ST ST. TO SR 2 <br /> F. INTERCHANGE IMPROVEMENTS; AUX. LANE ON I-5, BETWEEN 41ST ST. AND SR 2 <br /> 11 6 A. 2764. 0005 03 0.3 0 PE 8/99' _ EIS: <br /> 14 B. 5/635 05 P R/W 8/2001' OTHER 8000 8000 500 7500 CE: <br /> C. I-5/PACIFIC AVENUE INTERCHANGE 10 CONST 2/2002' EA: DATE: <br /> D. PACIFIC AVENUE i I-5 TOTAL N/A: <br /> E. INTERSTATE 5 OVERCROSSING AT PACIFIC AVENUE <br /> F. INTERCHANGE IMPROVEMENTS - <br /> 11 7 A. 2588, 0005 03 0.3 0 PE 8/99' EIS: <br /> 14 B. 5/620 05 P R/N 8/2001' OTHER 14000 14000 1000 13000 CE: <br /> C. I-5/112TH STREET INTERCHANGE. FLYER STOP. P/R LOT 10 CONST 2/2002' EA: DATE: <br /> D. 2-5. 112TH STREET TOTAL N/A; <br /> E. I-5, 112TH STREET <br /> F. INTERCHANGE IMPROVEMENTS, TRANSIT FLYER STOP, P/R LOT <br /> II 8 A. 2760, 0005, 0002 03 0.3 0 PE 8/99' EI5: <br /> 14 B. 5/640 05 P R/W OTHER 3000 3000 300 2700 CE: <br /> C. HEWITT AVE. ON-RAMPS TO EB SR 2 10 CONST 2/2001• EA: DATE: <br /> D. HEWITT AVE.. 1-5. SR 2 TOTAL N/A: <br /> E. I-5, SR 2 <br /> F. ON-RAMP L INTERCHANGE IMPROVEMENTS <br /> 12 9 A. 0526 05 3.2 0 PE 5/2002' EIS: <br /> B. N/A 06 P P R/W OTHER 25000 25000 25000 CE: <br /> C. SR 526 HOV LANE 12 CONST 2/2003' EA: DATE: <br /> D. SR 526 TOTAL N/A: <br /> E. I-5 TO 34TH AVENUE WEST <br /> F. DESIGN AND CONSTRUCT PERMANENT NOV LANE <br /> 11 10 A. 0096. 0005 04 0.2 0 PE 3/94' _ _ EI5: <br /> 14 8. 96/1 06 F R/W CE: <br /> C. NOV TREATMENT OF SR 96/I-5 INTERCHANGE 12 CONST 6/98' EA: DATE: <br /> B. 128TH STREET S. E. AND I-5 TOTAL ._OTHER 1600 400 2000 1800 N/A: <br /> C. SR 96/I-5 INTERCHANGE <br /> D. DESIGN/CONSTRUCT HOV FACILITIES ON RAMPS AND OVERPASS <br /> •A portion or all of the funding for these project phases has not yet been committed. <br /> NOTE: 'Local Funds' include City of Everett. Snohomish County, and/or Port of Everett funds contributed or tentatively contributed to the projects. <br />