Laserfiche WebLink
SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM. 1998 TO 2003 <br /> Agency: City of Everett <br /> City No.: 0420 Hearing Date Pg 2 <br /> County No.: 31 Adoption Date <br /> NPO: PSRC PRINCIPAL ARTERIALS Resolution Na. <br /> F P PROJECT IDENTIFICATION I S T U PROJECT COSTS IN THOUSANDS OF DOLLARS <br /> U t m t 0 1 t FUNDING SOURCE INFORMATION FEDERALLY <br /> N 1 A. FEDERAL AID ROUTE NO. p a C e 1 C FEDERAL FUNDING EXPENDITURE SCHEDULE FUNDED <br /> C C o B. BRIDGE NO. r T t anloPROJECT MONTH/ Federal Federal RAP STATE LOCAL TOTAL (Local Agency) PROJECTS <br /> T 1 r C. PROJECT TITLE o y u 1 g 1 d PHASE YEAR Cost Fund CAPD FUNDS FUNDS FUNDS 4th, ENVIR. R/W <br /> Ne 1 N D. STREET/COUNTY ROAD NAME OR NUMBER v p s t t e PHASE By Code TIA 1st 2nd 3rd 5th, TYPE REQ. <br /> L e t o. E. TERMINAL BEGINNING AND END . e h y s STARTS Phase DATA 6th Y/N <br /> y F. DESCRIBE WORK TO BE DONE OTHER DATE <br /> 1 2 3 4 5 67 8 9 _ 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 14 1 A. 0527 04 F 1 'C PE 1/93 _ EIS: X Yes <br /> B. N/A 06 4 P R/W 9/96 • CE: <br /> C. 19TH AVENUE SE (SR 527) IMPROVEMENTS 12 S 0 CONST 3/98 • EA: DATE: <br /> D. 19TH AVENUE SE, SR 527 T TOTAL TIA 6584 1216 7800 1300 5500 5500 N/A: 6/96 <br /> E. 112TH STREET SE TO 132ND STREET SE <br /> F. DESIGN AND CONSTRUCT ADD. LANES; SIGNAL IMP., SIDEWALKS, ETC. _ _ <br /> 14 2 A. 2764 03 P 0.1 C PE 2/99• EIS: <br /> B. N/A 08 P R/W 3/2000 • TIA 8000 2000 10000 750 3000 6250 CE: <br /> C. PACIFIC AVENUE/BNSF RAILROAD OVERCROSSING 12 0 CONST 5/2001 • OTHER EA: DATE: <br /> D. PACIFIC AVENUE 21 T TOTAL N/A: <br /> E. PACIFIC AVENUE EAST OF SMITH STREET <br /> F. DESIGN 4 CONSTRUCT GRADE-SEPARATED ARTERIAL OVERCROSSING <br /> 14 3 A. 2791. 0099 04 0.5 C PE 10/96 _ EIS: <br /> B. N/A 06 F P R/N CE: <br /> C. EVERGREEN WAY IMPROVEMENTS 12 0 CONST 8/97 EA: DATE: <br /> D. EVERGREEN NAY T TOTAL TIA 217 217 434 100 N/A: <br /> E. 108TH STREET TO 112TH STREET <br /> F. DESIGN AND CONSTRUCT ROADWAY WIDENING TO 7 LANES <br /> 14 4 A. 2791 04 0.5 C PE 12/96 EIS: <br /> B. N/A 06 F P R/W _ CE: <br /> C. EVERGREEN WAY IMPROVEMENTS 12 0 CONST 3/98 EA: DATE: <br /> D. EVERGREEN WAY T TOTAL UATA 770 192 962 900 N/A: <br /> E. MADISON STREET TO PECKS DRIVE <br /> F. DESIGN AND CONSTRUCT ROADWAY WIDENING TO 7 LANES , <br /> 14 5 A. 2791 04 0.5 C PE 12/96 EIS: <br /> B. N/A P P R/W CE: <br /> C. EVERGREEN WAY IMPROVEMENTS 0 CONST 8/98 EA: DATE: <br /> D. EVERGREEN WAY 06 T TOTAL UATA 880 220 1100 30 1070 N/A: <br /> E. PECKS DRIVE TO 52ND STREET 12 <br /> F. DESIGN AND CONSTRUCT ROADWAY WIDENING TO 7 LANES _ <br /> 14 6 A. 2791 04 0.25 C PE 4/98 15 STP EIS: <br /> B. N/A P P R/W CE: K NO <br /> C. EVERGREEN WAY IMPROVEMENTS 0 CONST 9/98 139.5 STP EA: DATE: <br /> D. EVERGREEN WAY 06 T TOTAL 154.5 STP TIA 154.5 309 309 N/A: <br /> E. 112TH STREET TO SOUTHERN CITY LIMIT 12 <br /> F. DESIGN AND CONSTRUCT ROADWAY WIDENING TO 7 LANES <br /> 14 7 A. 2791 04 0.25 C PE 1/2000• EIS: <br /> B. N/A P P R/W CE: <br /> C. EVERGREEN NAY IMPROVEMENTS 0 CONST 7/2000• EA: DATE: <br /> D. EVERGREEN WAY 06 T TOTAL UATA 700 210 910 910 N/A: <br /> E. 47TH STREET TO 41ST STREET 12 <br /> F. DESIGN AND CONSTRUCT ROADWAY WIDENING TO 7 LANES <br /> 14 8 A. 2776 04 0.1 C PE 5/98 EIS: <br /> B. N/A 06 P P R/W 8/98 CE: <br /> C. 41ST STREET IMPROVEMENTS 12 0 CONST 2/99 DATA 785 197 982 236 746 EA: DATE: <br /> D. 41ST STREET T TOTAL N/A: <br /> E. RUCKER AVENUE TO FRIDAY AVENUE <br /> • <br /> F. DESIGN AND CONSTRUCT ROADWAY WIDENING, IMPROVEM4ENTS <br /> 14 9 A. 0529 04 0.9 C PE 11/95 344 STP (0);NHS EIS: Yes <br /> B. N/A 06 F P R/W 4/96 178 STP (U);NHS OTHER 1845 285 2652 1000 CE: X <br /> C. EAST MARINE VIEW DRIVE IMPROVEMENTS 12 O CONST 7/96 _ TIA EA: DATE: <br /> D. EAST MARINE VIEW DRIVE. SR 529 T TOTAL 522 N/A: 4/96 <br /> E. ALVERSON BRIDGE TO NORTH BROADWAY 12 <br /> F. DESIGN AND CONSTRUCT ADD. WB LANE; SIDEWALKS: ETC. <br /> •A portion or all of the funding for these project Phases hes not yet been committed. <br /> NOM, 'Local Funds. include City of Everett, Snohoaieh County, and/or Port of Everett funds contributed or tentatively contributed to the projects. <br />