My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6001 36TH AVE W BASE FILE 2018-01-02 MF Import
>
Address Records
>
36TH AVE W
>
6001
>
BASE FILE
>
6001 36TH AVE W BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2021 1:36:53 PM
Creation date
3/31/2017 8:11:44 AM
Metadata
Fields
Template:
Address Document
Street Name
36TH AVE W
Street Number
6001
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
743
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hod <br />H <br />C H <br />at the westbound off -ramp intersection in the AM peak hour was <br />projected to be at an "F" in 1995, without this development. These are <br />unacceptable conditions. AM and PM peak hour impacts to the LOS at <br />this interchange should be addressed. <br />Since the projected LOS at this interchange will deteriorate with this <br />proposed development and major capacity improvements to SR-526 and its <br />ramp intersections may not be feasible, the Department suggests that <br />providing TSM measures such as HOV (high occupancy vehicle) queue <br />jumps or bypasses, and transit subsidies or carpool priority parking <br />be considered. We recommend the developer agree to nitigate his <br />impacts, on a proportionate share basis, for improvements to the SR- <br />526/20th Avenue West interchange. <br />The traffic analysis did not analyze the development's impacts to SR- <br />99 because the trip generation diagram did not cover a large enough <br />area. Since SR-99 is a major north/south arterial the Department <br />expects that there will be daily trips generated by the development on <br />this highway. We recommend the developer prepare an analysis to <br />determine if the development will have 10 or more AM peak hour trips <br />traveling through a SR-99 intersection. We will need this analysis to <br />complete our review. <br />Thank you for the opportunity to continent on this proposal. Should you <br />have any questions, please feel free to contact Donald Hurter (562- <br />4274) or Ed Giraud (562-4262) of my Developer Section. <br />Si rely ; <br />601 <br />J. ES L. LUTZ, P.E. <br />i ilities/Developer Engineer <br />EG:eg <br />cc: Mr. Al Clow, Berkley Engineering & Construction, Applicant <br />Mr. Sam Richard, WSDOT-State Aid <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.