Laserfiche WebLink
5) Appropnate access to City Standards (or all anficr,�ated uses within fhe projecf; <br /> Finding: Prim2ry access to the proposed lots :vithin the BSP will be from a new access �I <br /> road extending from 36`h Avenue W. <br /> Conclusion: Adequate circulation and access would be provided to all lots within the <br /> BSP. <br /> 6) Provisions for all oppropriate deeds, dedications, and all other easements � <br /> Finding: Easements must granted between lots where necessary to provide access, � <br /> utilifies, and for stormwater conveyance. Public easements will be required on private � <br /> property for water mains. <br /> Conclusion: Adequate provisions must be made for deeds, dedication and other <br /> easements. <br /> 7) Provisions made (or access to and maintenance o(all common (acilities. <br /> Finding: The City will require appropriate access a�d maintenance easements as part <br /> of the review for final BSP approval. <br /> Conclusion: Prior to final aNprovai, the Applicant shall provide appropriate easement <br /> documents, agreements and covenants addressing ownership and maintenance of, and <br /> access to common facilities as requirec' These documents must h� ;ar.orded prior to, or <br /> concurrently with, the final BSP. <br /> E. Existing Public Facilities and Services - The proposed pruject shall be designed to <br /> not adversely impaci the foilowing public facilities and service�: <br /> 9) Existing streets and other transportafion systems; ! <br /> Finding: The site is accessed from either of two public streets surrounding the site ancJ <br /> from internal access roads that have either been installed or will be installed as part of <br /> the BSP. Public transportation is available to the site. <br /> Conclusion: Existing streets and public transportation can be provided to all lots within <br /> the BSP. <br /> 2) Existing utilities system; <br /> Finding: The City has conducted an analysis of utility needs for this proposal. The City <br /> has capacity in its existing utility systems to provide service to this project sile. Sysfem- <br /> wide needs have been identified through the SW Everett Planned Action Determination 1 <br /> and EIS. � <br /> Conclusion: The additional lots created will not impact the Cily's existing utilities � <br /> system. Required utility improvements for the development are addressed in the <br /> preceding sections of lhis decision and the conditions listed herein. <br /> 3) Polica, Fire, Parks, and Schools; <br /> _� <br /> ��� , <br /> �------, .,.._. .. . , , .,,. . .. ----r�--�---�—��;�--�--�-,t,s--�_ ��:�._.� -a.��-f . .. . . <br />