Laserfiche WebLink
jo M <br />SH�Gfn <br />H x H <br />K O <br />H <br />�G fA O [ H�+ <br />LTJ <br />HC <br />NOMg <br />ZH <br />iyyi Y �] <br />Cy <br />HH <br />gy <br />00 rAA <br />HOCA <br />Preconstruction - Fire Inspection Requirements <br />Boeing Employee Activity Center <br />Job 564 <br />Page 3 <br />b) Discussion took place as to Boeing requirement to have <br />indicators above ground. Not usual to have per City of <br />Everett indicators are right below lid. Nothing that <br />Boeing has to climb into vaults etc. <br />c) 1) Hydrant placement per City requirements is not more <br />than 200' or less than 50' from building. <br />2) Hydrant hose fitting requirement is at 5" Stortz. <br />Deeny to obtain the new Everett standards and <br />compare specifications. <br />d) Deeny to furnish cost information to run 1 line vs 2 to <br />building furnishing a T for placement of PIV. Near SE <br />fire entrance. <br />e) Public works has a new code requirements book out $25.00. <br />Deeny to obtain. <br />Ce.' 6) Attachmentst <br />5 <br />eg a) Backflow Preventor. This is for building domestic <br />backflow prevention required by the City. GLY and <br />9167391E /Ne Nardone to compare with submittal and Boeing <br />/]EEiVU specification for conformance. Information will also be <br />e@: / forwarded to Grade for proper pipe sizes etc. <br />ELr—de b) WAC regulation RE: Underground fire protection <br />fiDVANCE responsibility. <br />