My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6400 36TH AVE W 2018-01-02 MF Import
>
Address Records
>
36TH AVE W
>
6400
>
6400 36TH AVE W 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2021 2:34:41 PM
Creation date
3/31/2017 8:26:47 AM
Metadata
Fields
Template:
Address Document
Street Name
36TH AVE W
Street Number
6400
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
383
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9Hr~i� <br />y <br />EVERETT EMPLOYEE ACTIVITY CENTER MENHWEI <br />PROJECT MEMO I .'y 18 1990 <br />EVERETT BUILDIMG DEPT. <br />May 11, 1990 <br />TO: J. Maish, BEC Engineers <br />SUBJECT: Minutes From Preliminary Design Review Meeting , May 11, 1990 <br />The purpose of this memo is to record structurally pertinent items discussed or <br />decided on in the above review. <br />1) The most current grading plan was requested by BECE from the Site <br />Consultants. It is expected next week. The finished slab elevation was determined <br />to be 580.75 FT at the upper slab. The finished floor at the gym will be 114 FT <br />below this at elevation 566.75 FT. <br />2) It was mentioned that there WOUld be two separate bid options affecting <br />the building layout. The configuration of these options was requested such that u <br />they may be addressed by the design. <br />3) The West wall at the Southwest corner of the building was made T3f=eP= <br />continuous and straight to the North end of the building. This addksA6 al- u§- <br />feet t simplifies the low roof framing in this area. �'��• w �""� <br />4) The Southeast access door to the hack -will fie niodified'?o avoid f`ieata. <br />inch change in floor height at the tracks banked corner. i S •�_ 9no�s At-, <br />5) It was determined that the added cost to provide structure now for <br />expansion of the Classroom area, South and of the Activity Rooms, East would'U.z t Net <br />be less that $1000. It was decided to provide for this expansion in the current <br />design. The possible size of these expansions should be determined. iF:b F.-- $(r , --3 7y Y <br />t---� 6) Structural floor loadings were verified to be 100 PSF at both the Running <br />Track and the Aerobics Area. It was also noted that dynamic and impact effects <br />would be addressed(l both these areas during the Final Design. <br />Russell Olson <br />_C)t`-1�1-7tti <br />cc: P.Kosteniuk <br />S. Rangram <br />�-4VP' W.E. Moor <br />
The URL can be used to link to this page
Your browser does not support the video tag.