Laserfiche WebLink
9 F-3 Ea <br />H x <br />fC C) <br />� N ��+ <br />t r <br />L] T lS N 1� <br />HT <br />IJ <br />I;.4y 18 1990 <br />•y <br />EVERETT BUILDING DEPT. <br />gy �-3 <br />May 14, 1990 <br />H <br />aC[n <br />o PROJECT MEMO <br />EEAC BUILDING 40.201 <br />JOB NO. 89165 <br />5/11/90 <br />REFERENCE: MEETING 5/11/90, 9:00 A.M. <br />MECHANICAL ACTION ITEMS <br />Everett Employee Activity Center <br />Preliminary Design Review Comments - Mechanical <br />f <br />t"r 1. Everett Facilities Group will check with the Everett Building Department tf�f ventilation requirements for gymnasiums and locker room areas. <br />- <br />I 2. Control of building ventilation will be with centralized control panel <br />a somewhere within the activity center building. 1 bjo. W cow <br />,a---Exact-room location to -be determined later— ems- co ti�CYo` <br />�YST�M 6Y l.fl <br />b.—Specifir�type of control will be determined-later2'tt�L-,G-.-Z-Fvo t.� �vt-ass <br />C. BE&C Engineers will receive a schedule of building occupancy from <br />the Everett facilities group. ytE�!T:,, <br />i I I 3. BE&C Engineers should visit the Oxbow site to gain insight into any potential <br />` problems that could be avoided in the Everett activity design, i.e., fitness Yes <br />area seems to be under -ventilated at Oxbow. <br />7 <br />4. Arrange meeting with Ed Galiger and Bob Wiitala for mechanical <br />coordination on i ems�eviating-from_ttte-design criteria and to discuss the <br />control of buildigventilation. <br />w `L �JFg � l-.l ST O F C't�.�•tiS <br />Ernie Schack <br />