Laserfiche WebLink
FC C] <br />�r1oH <br />xxNH <br />[r1 O M <br />y tJ <br />N@IS <br />H C.' <br />t'r z <br />Qy <br />c�Ccn <br />��CA <br />INftAN, <br />�t <br />Boeing Commercial Airplane Group <br />P.O. Box 3707 <br />Seattle. WA 98124-2207 <br />October 19, 1990 <br />T-6140-0-691 <br />Mr. K. C. Housdon <br />Public Works Director <br />City of Everett <br />3200 Cedar Street <br />Everett, WA 98201 <br />Dear Mr. Housdon: <br />BOA//VG Subject: Employee Activity Center MDNS Earth Quantity <br />Clarification <br />I am writing to report that the quantities of earth to <br />be moved on -site and hauled off -site for the <br />construction work to be permitted at this time has <br />changed from the 5000 cubic yards of material that we <br />reported in the SEPA Environmental Checklist prepared <br />Augus'r 23, 1989. <br />For your informatioc., the existing construction contract <br />excludes the baseball fields which account for the <br />greatest majority of the earthwork. We soon plan to add <br />two of the fields to the work to be constructed. <br />We estimate that the existing work under application <br />will ork on -site, <br />haveally nced torbewWith <br />hauled off -site - <br />We have estimated that to field all four ballfields will <br />require an additional 2000 cubic yards of duff to be <br />hauled off -site, plus about 6,500 cubic yards of fill <br />material to be removed from the ballfield area and <br />relocated to our main site at locations as permitted. <br />We plan to allow the contractor on option to move this <br />material along a haul road as indicated on the attached <br />sketches. We understand that this road is approved <br />under the MDNS Sepa #157-89 as under the "limited use <br />access road" which we delineated in our application. <br />We hope this clarification <br />forward to working with you <br />obtaining the full building <br />Activity Center. <br />Sincerely, <br />Rutkow <br />erector of Facilities <br />is satisfactory. We look <br />to finalize the matters of <br />permit for the Employees <br />