My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3210 36TH PL NE 2018-01-02 MF Import
>
Address Records
>
36TH PL NE
>
3210
>
3210 36TH PL NE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2022 3:27:47 PM
Creation date
3/31/2017 8:32:27 AM
Metadata
Fields
Template:
Address Document
Street Name
36TH PL NE
Street Number
3210
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TaGle 2. Ultimate Lateral Pile Capacity— 18-inch Augercast Pile <br /> Latoral Free Hoad Condition Fixed Head Candition <br /> � Deflectfon Lateral Load Maximum Bending Laterel Load Maximum Bending <br /> (in) (k�P) Moment(�n-kip) (kip) Moment(in-kip) <br /> ---__------------- -- _-- ------ __ . _ _ ____ <br /> Y. 10 650 30 2,000 <br /> - --------- -- �--- -...._.— -- <br /> y, p5 1,250 65 3,800 <br /> ---�------qg — --��—2,400 110 —�-- ---- 7.000 <br /> Sett/ement <br /> �Ve estimate that the post-conswclion settlemen[ of pile foundations, designed and installed as <br /> �- <br /> recommended, will be on the order of i, inch or less. Maximum differentiil sctdement should bc Icss <br /> than about one-half the post-construction settlemcnt. Most of this settlemcnt �vill occur rapidly as loads <br /> arc applicd. <br /> Construction Considerations <br /> �I The augercust piles should be installcd to thc recommended tip elcvatior.s using a continuous-(light. <br /> � hollow-stem augcr. 'I'he augercast piles gencrate cuttings as the soil is rcmo��ed. As is standard practice, <br /> the pile grout must be pumped under pressure through thc hollow stem as the auger is withdrawn. <br /> I Maintenance of adequate grout pressurc at the auger tip is critical [o reduce the potential for <br /> I encroachmenl of adjacent native soils into the grout column. 7�he rate ol withdrawal of Qie auger must <br /> remain constant throughout the installation of the pilcs in order to reduce the potential for necking of dic <br /> f piles. Pailum to maintain a constant rate of wididrawal of the auger will result in immediate rejection oC <br /> � that pile. Reinforcing steel for bcnding and uplift should be placed in thc &esh b�out column as soon as <br /> possible aEier wi[hd�awal of the augcr. Centering devices should be used to provide concrete co�cr <br /> Iaround thc reinforcing stcel. <br /> We recommend that there bc a �vaitinc p�riod of a[ Icast 12 hours benveen the installation of piles spaccd <br /> � closer than 8 feet, center-to-centcr. �Chis ���aiting periud is nccessmy m avoid disturbing the curi�g <br /> concre[e in previously cast piles. <br /> Grout pumps must be �itted �cith � �ulumc-mcasurin� dc�'iec and pressure �auge su that thc �ulumc of <br /> grout plaeed in eaeh pile and the pressure head maintain��l during pumping can be obserced. :� minimum <br /> grout line pressure of 100 pounds per square inch (psij should be maintained. The rate af augcr <br /> withdra�val should be cnnvolled during grouting such that the volume of grout pumpcd is cqual to at least <br /> 1 IS percent of the theorctical pile volume. A minimum head of l0 feet of grout should be maintained <br /> above the auger tip during withdr�wal of the auger to maintain a full column of grout and prevent holc <br /> col lapsc. <br /> We mcommend that the augercast piles be irstalled by a contracror experienced in their placement and <br /> using suitable equipment. To hclp moniG�r pile qualiry, we recommend diat the contractor be required to <br /> provide a pmssure gauge in the grout line behveen the pump and auger, and to provide a means of <br /> mcasuring the quantity of grout used in eadi pile (such as s stroke counter snd pump calibmtion j. <br /> 'Che action of the augcr may tend to disturb the soil at the 6ottorn of the drilled hole, which would result <br /> in decreased end-bearing capacity. In order to minimize the negati��e effects of tliis dis[urbance, ���c <br /> recommend that the pile contractor be reyuired to rotate die auger fo!lo�ving pumping of the first fe�c <br /> Fila No.8937-004-00 Paj�B 1 S GEOENG INEEB� <br /> e�r�nher 1/. 1006 <br /> ,�,. .-- -- „r t,�.� � . , . , " _ ,. `t {�jl., , _.I <br /> z d y <br />��.�, ,y �3,,� . .,�'h �_ � - } 1 ��r�L 1 � �.: y.��,�8`,+� ,� I �{ � E 9� � _',. `G.. <br />�f p���' ...�: _ _ — _.— � .�_.. � _ ����, . ' � . i � ,{��i�sfiJ�/_:.. {kM1�!-��if� . Ti�.�,'� <br />
The URL can be used to link to this page
Your browser does not support the video tag.