Laserfiche WebLink
Concrctc Nor'��cst firc Il�nv work-around P.�gc 1 of Z <br /> Benyam Stephanos ___ _ _ _ j>�JG�S;'�1�-� _ <br /> From: Jenifer Galatas <br /> Seni: Wednesday, July 18, 2007 3:35 PM <br /> To: Benyam Stephanos <br /> Subject: FW: Concrete Nor'west fire flow work-around <br /> fyi....hopefully the last one for a wliile <br /> From: Mark Wolken [mailto:wolkenm@msn.com] <br /> Sent: Wednesday, July 18, 2007 3:33 PM <br /> To: Kirk Brooks; Klaus]anssen; Rick Robinson <br /> Cc: Glen Martinsen; Jenifer Galatas <br /> Subject: Re: Concrete Nor'west fire flow vdork-around <br /> Thanks Rick. I just 9ot back from out there and it looks like the only Cedar Grove hydrant is <br /> north of the road, so one way or another we'll probably have to put a pipe in the road and go <br /> through that. <br /> Mark <br /> ----Original Message ---- <br /> From: Rick Robinson <br /> To: Mark Wolken ; Kirk Brooks ; Klaus Janssen <br /> Cc: Glen Martinsen ; Jer�`.er Galatas <br /> Sent: Wednesday, July 18, 2007 3:13 PM <br /> Subject: RE: Concrete Nor'west fre flow work-around <br /> South side is fine, but the hydrant can be on the opposite side of the road. The road will be closed if there is a <br /> fire at the batch plant and the hydrant could be on either side. What ever makes sense. RR <br /> From: Mark Woiken [mailto:wolkenm@msn.com] <br /> Sent: Wednesday, ]uly 18, 2007 14:39 <br /> To: Kirk Brooks; K.laus )anssen; Rick Robinson <br /> Cc: Glen Martinsen; Jenifer Galatas <br /> Subject: Re: Concrete Nor'west fire flow work-around <br /> Than�:s Rick. One clarificaton-since the batch pint is south of the access road and the new <br /> watarline will extend from the batch plant to Cedar Grove (which may provide a conduit for the <br /> hose) shouldn't the hose run south of the road? Otherwise we'll need to put in some type of <br /> crossing to get it over chere. <br /> Mark <br /> ----- Original Message ----- <br /> From: Rick Robinson <br /> To: Mark Wolken ; Kirk Eirooks ; Klaus Janssen <br /> Cc: Glen Martinsen ; Jenifer Galatas <br /> Sent: Wednesday, July 18, 2007 2:15 PM <br /> Subject: Concrete Nor'west`ire flow work-around <br /> �I <br /> 7/1 S/3007 <br />