Laserfiche WebLink
5.0 LIMITATIONS <br />We have prepared this report for the exclusive use of Cedar Grove Composting and their authorized <br />agents for the proposed Smith Island composting facility. <br />Within the limitations of scope, schedule and budget, our services have been executed in accordance <br />with generally accepted practices in the field of geotechnical engineering in this area at the time this <br />report was prepared. No warranty or other conditions, express or implied, should be understood. <br />Please refer to Appendix C, titled Report Limitations and Guidelines for Use for additional <br />information pertaining to use of this report. <br />4or <br />We appreciate the opportunity to be of service on this project. We trust the above provides the <br />information you require. Please contact us if you have questions or if we can be of further assistance. <br />F,-PIRB9 /D .Z3 aS <br />RCM:DJC:akEja - <br />EVERMTinaW 1062500102Rdoc <br />Respectfully submitted, <br />GeoEngineers, Inc. <br />r t <br />Fote.Robert C. Metcalfe, PE, LEG <br />Senior Geotechnical Engineer <br />Daniel I. Campbell, PE <br />Principal <br />& <br />G e o E n g i n e e r s 23 File No. 10625401-021123003 <br />