Laserfiche WebLink
-�-� -- <br /> 10. The tiTashington State Clean Air Act requires the use of all kr.own, <br /> availai�le, and reasonable means of controlling air pollution, including <br /> dust. Dust generated during construr:._�n a.ctivities cen be controlled <br /> by wetting those dust sources such .is areas of exp:ised seils, washing <br /> truck wheels before they leave the s�`e, and site, and installing and <br /> maintaining gravel construction encrances. Cot;strrction vehicle <br /> track-out of dirt is also a ma��� dust source. Any evidence of <br /> track-out can trigger violations and fines from the Department of <br /> Ecology or the Puget Sound Air Pollution Control Agency. <br /> 11. Constru�tion or substantial progress toward construction of a project <br /> must be undertaken within 2 years after final apgroval o£ the permit, <br /> and completed wtthin 5 years. If the project has r.ot Ueen comnleted in <br /> this time span, the permit will be reviewed by the Planning Department <br /> which will do one of the following: <br /> - extend the permit for one year, or <br /> - terminate the permit. <br /> � � ///��/ ��=7/ . �� ����� <br /> !/1_iGr / (_./ , %i!E°%T{ ,!�.. c .- �`�.� <br /> Paul A. Roberts, Director <br /> Planidng and Community Development <br /> -4- <br /> � <br /> s�,I <br /> '^� <br /> `� l <br /> --- ..�.:� _ _ sT. --_.. ., <br />•�v.: � __ - � � - - �-� <br />