Laserfiche WebLink
� c. Construction Monitoring. A biologist should be present during <br /> construction to ensure proper line installation consistent with the <br /> submitted plan. If intrusion into sensitive areas beyond that <br />�' indicated in the plan is required, the biologist shall confer ti�ith City <br /> thatfmay not havepbeenaproperlycmappedaas wetla 3ionsthelatta hede mapsas <br />� d. Monitoring. A monitoring plan shall be snbmitted to the City. <br /> The monitoring shall cover a Iive-year period and shall ensure <br /> establishment of thelsnssareeon file withathe City es. Examples of <br /> acceptable monitoring p <br /> 6, Banks and dikes where such facilities enter or leave a body of waL-e: <br /> shall be returned ta their pre-construction configuration, shall be <br /> thoroughly c��npacted and protected aeainst erosion, and shall be <br /> maintained in a safe condition by the utility. <br /> 7, Utility lines Entering or leaving a body of water, other than a river, <br /> shall oe buried below the surface of the water body's bed out to a <br /> r�inimum water depth of minus ten feet (-10'), measured from mean lower <br /> low water PkOVIDED that, where the utility consists of a flexible cable <br /> and the bottom material is soft, such cable need only be buried to a <br /> depth . of minus five (-5'), measur:d from mean lower low water; and <br /> PROVIDED FURTHER that, if such catle does not bury itself to a minimum <br /> depth of ten �10) feet below mean lower low water within one year of <br /> instal'lation, the permittee shall bury the cable to such depth. <br />� ���C" $. Underg,round utility lines shall be completely buried under the river <br /> M�, <br /> u,,,�,,,� bed �n all river or stream crossings except where such nes are <br /> i . R�vc�- permanently affixed to a bridge structure. <br />' 9. If any possible archaeological data is uncovered during the excavation <br /> or development of this project, the Applicant must notify the City of <br />�� Everett Planntr.g Department immediately at 259-8731. Failure to comply <br /> with this car,.l;tion shall be considered a violation of the Sho:celine <br /> planagement Suhstantial Development Permit. <br /> 10. The Washingt�n State Clean Air Act requires the use of all knc�m, <br /> available, and reasonable meaiis of controlling air pollution, including <br /> dust. Dust generated during construction activities can be controlled <br /> by wetting those dust sources such as areas of exposed soils, washing <br /> truck wheels before they leave the site, and site, and installing and <br /> maintaining gravel ccnstruction entrances. Construction vehicle <br /> track-out of dirt is also a major dust source. Any evidence of <br /> track-out can trigger violations and fines from tY�e Department of <br />� Ecology or the Puget Sound Air Pollution Control Agency: <br /> i <br /> !`� <br /> 3 <br /> M1`i <br />�VA�erilft.�:L'.'C"-:",:�: J9uL'FtG:�:. . . . . .. .. . . .. " ... � -......�. .. <br /> y'.w <br /> ,.-,.....-E ..1.-:,s�....._..x.A.. ,.-. .'.., ' °�u1�a..ma:sL'&ya.iw.atr.... .�rn. �"�T. -.....a.;N�- :,y; .,.,Lw�_ . � .. . <br /> n ti � C^ �i -' � _ _ " -' .' �1 n.�, <br />