Laserfiche WebLink
• <br /> 1. <br /> 3 Project: Wiggums Hollow Skate Park <br /> Change Order No.2 <br /> Change Order Effective Date: 08/27/08 <br /> ._r 94;'.rL1 t�it0CMF i,'4- ..f il i-. �ij! U+ t^L r:g- g"(l- S111;'I1� '.l..i f1 ..R4c€9ftk11 Yli�"'f iN'roS t}ts <br /> wir Y• 3 , <br /> By Date: <br /> Officer <br /> Exhibit A—Description of Changed Work <br /> Change Order#2 consists of the following change proposals: Traffic signs and a storm water <br /> separator as required by project plan review, digital video recorder and router for the camera <br /> surveillance system, revision of the light pole installation from embedded to surface mount, <br /> an inside drop manhole connection as required by Public Works, trimming of chain link fence <br /> bolts to eliminate a safety hazard, relocation of ADA railing to eliminate opportunities to climb <br /> skate park perimeter fence, removal of unsuitable soil and placing.of rock for structural <br /> stability under parking-lot-exit, removal of 480 yards of unsuitable soils and a small quantity of <br /> existing debris from construction site, additional grading and topsoil to create a berm on the <br /> north side of the park and a deductive change proposal to eliminate the planting of fir trees. <br /> 81 <br /> Page 3 of 3 <br />