My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2902 36TH ST 2018-01-01 MF Import
>
Address Records
>
36TH ST
>
2902
>
2902 36TH ST 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2018 11:14:11 AM
Creation date
3/31/2017 9:24:01 AM
Metadata
Fields
Template:
Address Document
Street Name
36TH ST
Street Number
2902
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
943
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> f <br />� <br />� <br /> I <br />�'� <br />� <br /> Mr. ,Tamie G. Johuson 2/ 18/75 <br /> Inspection Supervisor Pagc 2 <br /> City of Everetl <br /> 7. S, T. R, did preparc its foundation plans for Scismic Zonc 3. <br /> 8. As we discussed, all piles are tied with grade beams or throu,�h <br /> the continuous wall structures. <br /> 9, Page 4 of the S. T. R. plans show the pile locations. <br /> 10. The four piles that will bear horizontal loads from the building <br /> �vill be tied with No. 8 rebar as we discussed. This is indicated <br /> on the rebar fabrication plans. <br /> 11. This comment must refer to the horizontal load ties. These splices <br /> will be enclosed in grade bcams and equipped with Class D splices <br /> as required. <br /> 12. As we discussed, the building has not been bid yet. The appropriatc <br /> calculation, will be forwarded to you after a bid has Ueen awarded. <br /> Therefore, we are not applying for final approval of the building <br /> structure at this time, <br /> I liave attached a complete list of the drawings that we have suUmitted to I <br /> you for this project. As we discussed, there zre �ome conflicts behveen <br /> what appears on the Dempster Standard Plans, and our site plans and Che <br /> S. T. R, plans. This is because we have modified the Dempster plans some- <br /> what to adapt them to this specific >iCe. Where conflicts do appear, our site <br /> plans and the S. T. R, plans gover.;. <br /> We recognize that the use of a standard set ot plans, which we adapted to <br /> the specific site by our site plans and th� S. T. R. plans, malces it diffi- <br /> cult to checic them for code a�>proval. Given lhe time cwistraints that tve <br /> are faci:�g, we appreciate your effort in �vorlcing with iis on this project. � <br /> Sinc _ y 1 <br /> C///� <br /> � <br /> od y G. Hans�n <br /> Director <br /> Solid Waste Division <br /> RGH:lclo <br /> Enc. <br /> f <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.