Laserfiche WebLink
/3 <br />CLOSED CM WORK ORDERS REPORT TO POSTING <br />Total Utility Maintenance Management System <br />10/28/1998 <br />----- Page 1 <br />Date Range :06/24/1900 - 10/21/1998 <br />CM Work Order Range :0810800810001 - UT2883- - Pattern :7101196730316 <br />Item Range :<Blank> - WVL36941,05 Pattern :* <br />Program ALL Function ALL Activity ALL <br />-------------------------------------------------------------------------------- <br />CM WORK ORDER ID: 710119673033.6 Title: TAP 37TH AND RUCKER AVE <br /><<DUPLICATE PRINTING OF THIS WORK ORDER>> �,�/ <br />Item ID: WlL3095S01 -- WATER MAIN LINE J /� <br />Location ID: -- <br />Program 710 Function 119 Activity 673 <br />Date Completed: 10/12/1998 <br />Overall Craft: <br />Issued: 08/06/1998 Issued by: IRD Assi ned to: 'AGE <br />Out of Service? NO Priority: Travel Time: <br />Meter Reading: <br />Downtime: 0 hours D <br />Status: DEC 1996 <br />................................................................ <br />Labor: CITY OF EVERETT <br />Craft ID Name Planned Hrs P68reps(� 3lGLePw Cost <br />----- ------------------------------------------------------------------- <br />WST AGE ALLEN, GARY E. 0.00 12.00 264.96 <br />WST BBA BRADLEY, BROCK A. 0.00 12.00 249.24 <br />UL CJE CASE, JAMES E. 0.00 12.00 194.40 <br />UL DMJ DOUCETTE, MARK J 0.00 12.00 194.40 <br />SUP2 GJ GARZA, JOHN (NMI) 0.00 5.00 132.60 <br />DLI MTL2 MARKHAM, TIMOTHY L. 0.00 5.00 47.50 <br />EO PTN PINON, THOMAS N. 0.00 4.00 80.36 <br />HEO WMF WELLMAN, MARK F. 0.00 12.00 250.92 <br />Materials: <br />ID Description <br />BOX000043347 BOX VALVE 18"TOP 24"BOTTOM CI <br />BOX000043647 BOX VALVE 24" CI BOTTOM ONLY <br />CONC00061338 CONCRETE MIX 60 LB. BAG <br />COUP46047147 COUPLING 8" MJ X MJ DI SLEEVE <br />N/A 8" MJ KIT <br />N/A 4" FLANGE KIT <br />N/A TAP FEE <br />REDU46147347 REDUCER 8" MJ X 4" FLANGE <br />SLEE42123447 SLEEVE TAP 4" MJ X 4" FLG CI <br />VALV42036148 VALVE GATE 4" FLG X FLG <br />Vehicles: <br />ID Description <br />------------ ------------------------------ <br />V0017 94 FORD AEROSTAR VAN <br />Total Labor Cost: 1414.3E <br />Date <br /># Used <br />Cost <br />-------- <br />10/09/1998 <br />-------- <br />1 <br />---------- <br />30.91 <br />10/09/1998 <br />1 <br />11.94 <br />10/09/1998 <br />3 <br />6.48 <br />10/09/1998 <br />1 <br />52.54 <br />10/09/1998 <br />75.00 <br />10/09/1998 <br />1 <br />3.64 <br />1u/09/1998 <br />1 <br />150.00 <br />10/09/1998 <br />1 <br />293.22 <br />10/09/1998 <br />1 <br />331.94 <br />10/09/1998 <br />1 <br />163.52 <br />Total Material Cost: 1119.19 <br />Hours Cost efl <br />---------------- <br />5.00 23.50-► <br />CENTRAL RECORDS <br />