Laserfiche WebLink
James Pirie JN 97072 <br />March 18, 1997 Page 11 <br />Subsurface conditions can also vary between exploration locations. Such unexpected conditions <br />frequently require making additional expenditures to attain a properly constructed project. It is <br />recommended that the owner consider providing a contingency fund to accommodate such <br />potential extra costs and risks. This is a standard recommendation for all projects. <br />This report has been prepared f(.r the <.Yclusive use of James Pirie and his representatives for <br />specific application to this project and site. Our recommendations and conclusions are based on <br />observed site materials, and selective laboratory testing and engineering analyses. Our <br />conclusions and recommendations are professional opinions derived in accordance with current <br />standards of practice within the scope of our services and within budget and time constraints. No <br />warranty is expressed or implied. The scope of our services does not include services related to <br />construction safety precaution:,, and our recommendations are not intended to direct the <br />contractor's methods, techniques, sequences, or procedures, except as specifically described in <br />our report for consideration in design. We recommend including this report, in its entirety, in the <br />project contract documents so the contractor may be aware of our findings. <br />ADDITIONAL SERVICES <br />In addition to reviewing the final plans, Geotech Consultants, Inc. should be retained to provide <br />geotechnical consultation, testing, and observation services during construction. This is to confirm <br />that subsurface conditions are consistent with those indicated by our exploration, to evaluate <br />whether earthwork and foundation construction activities comply with the general intent of the <br />recommendations presented in this report, and to provide suggestions for design changes in the <br />event subsurface conditions differ from those anticipated prior to the start of construction. <br />However, our work would not include the supervision or direction of the actual work of the <br />contractor and its employees or agents. Also, job and site safety, and dimensional measurements, <br />will be the responsibility of the contractor. <br />The scope of our work did not include an environmental assessment, but we can provide this <br />service, if requested. <br />The following plates are attached to complete this report: <br />Plate 1 Vicinity Map <br />Plate 2 Site Exploration Plan <br />Plates 3 - 6 Test Pit Logs <br />Plate 7 Footing Drain Detail <br />GEOTECH CONSULTANTS, INC. <br />C12 <br />