Laserfiche WebLink
• Storm Drain Inlet Protection (BMP C220) <br /> Element 8: Stabilize Channels and Outlets: All runoff will remain in a sheet flow <br /> condition as it leaves the site until it reaches the municipal storm drainage system; <br /> therefore, this Element is not applicable. <br /> Element 9: Control Pollutants: Pollutant Control Notes listed on sheet ER-02 of the <br /> construction plans specify pollutant controls. <br /> Element 10: Control De-Watering: Dewatering Control Notes listed on sheet ER-02 of <br /> the construction plans specify de-watering controls. <br /> Element 11: Maintain BMP's: Maintenance of BMP's are specified in the <br /> Erosion/Sedimentation Control Notes listed on sheet ER-01 of the construction plans. <br /> Element 12: Manage the Project: See elements listed above for management of this <br /> project. BMPs shall be maintained per Element 11. From October 1 through April 30, <br /> clearing, grading, and other soil disturbing activities shall only be permitted if shown <br /> to the satisfaction of the local permitting authority that silt-laden runoff will be <br /> prevented from leaving the site. <br /> October 2013 2-3 LDC Job No. 13-118 <br />