My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/10/08 Council Agenda Packet
>
Council Agenda Packets
>
2008
>
2008/10/08 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2017 11:55:43 AM
Creation date
3/31/2017 11:55:10 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/8/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 1 <br /> Revised Scope of Work Tasks 4 and 5 <br /> Task 4: SEPA Environmental Analysis (City/Ecology Task 6) <br /> Based on input from the Stakeholder Group and the public in Task 5, refine the alternatives, <br /> identify a preferred alternative, and prepare a draft environmental impact statement(DEIS). <br /> Include a draft land use plan graphic and feasibility level cost estimates. Circulate for public <br /> review and comment per SEPA requirements. <br /> SEPA/CMA environmental analysis. The draft Subarea Plan will focus on the preferred <br /> alternative/stakeholder recommended alternative covering the 12 topics listed below. <br /> .Discuss the following topics in the Draft Subarea Plan Report: <br /> -A summary of the area's restoration potential and feasibility and a listing of the <br /> -Fusibility of tidal habitat restoration considering property ownership; location and <br /> - - - - -- - - - - - - - - <br /> and towers;costs; and protection of adjacent properties. <br /> planting crops for wildlife. <br /> -Anticipated improvement in the ecological functions of the areas identified by the plan <br /> for restoration. <br /> including identification of committed and potential funding sources. <br /> restoration or enhancement opportunities. <br /> -a::: .. _ -. - - . .. _ . . 5: '• •, : -- - <br /> • <br /> Significance criteria, the comprehensive plan, and other applicable designations. <br /> Marshland Subarea Plan <br /> Scope of Work and Cost Estimate 1 Anchor Environmental,L.L.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.