Laserfiche WebLink
5 <br /> Task 5: Final-Subarea Plan - • : - ' • • " . • •• - • - • - - - (City/Ecology Task 7) <br /> Prepare a draft Subarea Plan based on the Parks/Planning Commission's preferred alternative. Circulate <br /> for public review and comment per GMA, SMA,and SEPA requirements. <br /> Discuss the following topics in the Draft Subarea Plan <br /> • The draft Subarea Plan will focus on the preferred alternative covering the 12 topics <br /> listed below. <br /> - A summary of the area's restoration potential and feasibility and a listing of the <br /> restoration goals and opportunities. <br /> - Feasibility of tidal habitat restoration considering property ownership;location and <br /> design of existing and planned infrastructure including roads, railroads,utilities, <br /> and towers;costs; and protection of adjacent properties. <br /> - Opportunities for nontidal habitat restoration and enhancement, such as providing <br /> habitat corridors for wildlife between Wood Creek and the Snohomish River and <br /> planting crops for wildlife. <br /> - Anticipated improvement in the ecological functions of the areas identified by the <br /> plan for restoration. <br /> - Timeframes and benchmarks for achieving the restoration goals and opportunities. <br /> - Measures or methods to promote habitat restoration and enhancement <br /> opportunities,including identification of committed and potential funding sources. <br /> - Identification of interested property owners who are willing to participate in <br /> habitat restoration or enhancement opportunities. <br /> - Opportunities and types of recreational uses that could be appropriate, or that <br /> would not be appropriate,in parts of the Project area. <br /> - Consistency with the Shoreline Management Act including Shorelines of Statewide <br /> Significance criteria,the comprehensive plan, and other applicable designations. <br /> - The appropriate shoreline environment designation for the area,based on the <br /> above analysis,including evaluating whether a new designation is needed and <br /> whether the entire area should have the same designation. <br /> - Policies and use regulations, including regulations for protecting critical areas in <br /> the Marshland including,but not limited to,buffers for wetlands and riparian <br /> areas,in the Shoreline Master Program and other development regulations. <br /> - Mechanisms to review the effectiveness of the Subarea Plan and make changes if <br /> review reveals the Subarea Plan is not effectively promoting the identified <br /> restoration opportunities or meeting its other goals,policies, and objectives. <br /> Marshland Subarea Plan <br /> Scope of Work and Cost Estimate 4E8c� Anchor Environmental,L.L.0 <br />