My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/10/08 Council Agenda Packet
>
Council Agenda Packets
>
2008
>
2008/10/08 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2017 11:55:43 AM
Creation date
3/31/2017 11:55:10 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/8/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> Appropriate technical information and other materials as appropriate <br /> • Submit draft subarea plan and draft SEPA/CMA EIS document to City staff in advance <br /> of the stakeholder meeting. Obtain City staff comments on these draft documents via <br /> conference call prior to the stakeholder meeting. <br /> • Present draft plan EIS to Project Stakeholder Group at one meeting. <br /> .Review and comment on City's draft of shoreline master program amendments based on <br /> the Project Stakeholder Croup preferred alternative,including: <br /> -Sections 4.15 Urban Conservancy Agriculture Interim and any other designation <br /> sections needed to reflect the preferred alternative: <br /> Section 3.11.J Restoration Element discussion of Marshlands <br /> -Any new policies or regulations needed in Section 3.9 Conservation Element. <br /> -Any other revisions needed to implement the preferred alternative. <br /> • Review and comment on City prepared notice of Plan/EIS availability and distribution <br /> list. <br /> Attend one meeting with City staff where they present the revised draft plan EIS to the public and Parks/ <br /> Planning Commissions with Commissions making recommendation to City Council on preferred <br /> alternative. <br /> • Meet with City staff at one meeting to review comments on Draft EIS prior to making <br /> final EIS revisions. <br /> • Review the comment response memorandum prepared by City staff for final EIS. <br /> • Prepare a comment response section for the final EIS based on the comment response <br /> memorandum. <br /> • Prepare Final EIS (FEIS). <br /> Task 4 Work Products <br /> • Draft Subarea Plan and SEPA environmental analysis and Final EIS report with <br /> figures, in PDF, MS Word document <br /> *Presentation maps of draft Subarea Plan graphics and draft proposed Shoreline <br /> Master Program designation(s) <br /> • Reviews comment on City prepared notice of Plan/EIS Availability and <br /> distribution list <br /> Task 4 Cost Estimate: $72,000 <br /> 1 ' <br /> Marshland Subarea Plan <br /> Scope of Work and Cost Estimate 3 Anchor Environmental,L.L.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.