My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2908 49TH ST SW 2016-01-01 MF Import
>
Address Records
>
49TH ST SW
>
2908
>
2908 49TH ST SW 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2017 5:28:24 PM
Creation date
3/31/2017 2:59:56 PM
Metadata
Fields
Template:
Address Document
Street Name
49TH ST SW
Street Number
2908
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />ISeptember 7, 2010 <br />Mc John Mustach <br />1 L&A Job No. ] 0-03G <br />1'age 5 <br />Stability Analyses and Design <br />"I'he computer probram, SRWaII version 3.22 computer program, was used in our stability <br />analyses of the precast concrete block wall. The results of the block wall stability analyses are <br />presentcd under APPENDIX attached to this report. Our design o£ the precast concrete block <br />wall is shown with the typical section of the wall and the general notes presented on Plates 3 and <br />4. <br />CONS7'RUCTION <br />Site Preparatiun and General Crading <br />Vegetation within construction limits of the block wall and wall backfill should be cleared and <br />roots lhoroughly grubbed. lbpsoil and surficial wcak soils within thc block wall and wall <br />backlill should Ue stripped down to dense undisturbed Lsperance Sand soil. Over-excavation <br />down to dcnsc Gsperancc Sund soil should bc backfilled with structural fill. <br />A silt tcnce should bc crcctcd along thc downhill sidc of the construction area, as required, to <br />kecp scdimcnt from being washcd down to adjacent strceL The bottom of the tilter fabric should <br />bc anchorcd in ai trcnch filled with onsite soiL A layer of cican quarry spalls shoidd be placed <br />over arcas of Gequcnl construction traffic, as rcyuired, to protcct subgrade soil f'rom disturbancc <br />by construction traftic. <br />Kcy�raV 'I'rcnch <br />�I�hc ke>'���ay trench fi�r the block wall should bc cut into nativc, undisturbed, dcnse rsperance <br />Sand soil, capablc of rcndcring an allowable bearing pressure of at Icast 3,000 psf. The soil <br />c�posed at bottom of thc keyway trench should be compacted to a non-yiclding state with a <br />vibratory compactor. Overvexcavation of unsuitable soils should be backfilled with structural <br />�ill. A minimum 4-inch layer ot� 7/8-icch-minus crushed rock leveling base, compacted to a non- <br />yielding statc, should bc placcd over the subgradc soils supporting the block wall. The base- <br />course hlocks are to be placed on this crushed rock base with an embedment at least 12 inches <br />LIU & ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.