Laserfiche WebLink
7. Any broken or damaged sidewalk shall be repaired/replaced Qer the City Public <br />Works Inspector. <br />8. Temporary erosion control measures for construction activity must be operational <br />prior to commencement of any clearing or earthwork. <br />9. The F�oject will require a building permit that adheres to the provisions of the <br />IRC (Building Code adopted by the City of Everett). <br />Done and dated this 31 st day of May, 2006. <br />�l• �IY,uo�ca�G <br />Jam . Driscoll <br />Heanng Examiner <br />