Laserfiche WebLink
�� . <br />CL08ED CM WOR1C ORDERB REPORT <br />Total Utility Maintenance Management System <br />O5/15/1997 Page 1 <br />maax3sevxa�aas:�mvveveoc-vcv=e=evice=ovvocoveov==co__-c==_=e�=e===vee_ecove=c-ee <br />Date Range :O1/09/1989 - 05/15j1997 <br />CM Work Order Range :1001091070001 - 8401086700001Pattern :7101236730191 <br />item Ranqe :<Blank> - WVL3694L05 Pattern :* <br />Proqram ALL Function ALL Activity ALL <br />=-�=_--- ------u-----__=___________�_�_�______=____________________ <br />CM WORK ORDER ID: 7101236730191 Title: REPAIR 915 - 51ST STREET S.W. <br />«DUPLICATE PRINTING OF THIS WORK ORDER» <br />Item ID: DDL3694X35 -- DRAIN LINE <br />Location ID: -- <br />Proqram 730 Function 123 Activity 673 <br />�Jate Complated: 04/29/1997 <br />Overall Craft: <br />Issued: O1/13/1997 <br />Out of Service? NO <br />Meter P,eadinq: <br />Downtime: 0 hours <br />Status: HN <br />Labor: <br />Craft ID Name <br />----- ------ ---- <br />HEO <br />SUP1 <br />UL <br />jJL <br />DLI <br />UL <br />EO <br />HEO <br />UL <br />EO <br />EO <br />UL <br />HEO <br />EO <br />UL <br />AAL <br />AGA <br />P,MPr <br />HDN <br />HGF <br />HLF <br />KAE <br />LDC <br />Miil�, <br />MJE <br />MJL2 <br />NCR <br />SDD <br />SDK <br />WTE <br />Materials: <br />ID <br />BRIC00061156 <br />CEME00061438 <br />COUP50301647 <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />PIPE46304347 <br />PIPE50304547 <br />Issued by: HDA Assigned to: AGA <br />Priority: Travel Time: 0.00 Hr. <br />ARNOLD, ARTHUR L <br />AHLES� GREGORY A. <br />ALLEN, MARK A. <br />HARRIS, DANIEL N. <br />HAYDEN, GERALD F. <br />HUSBY� LARRY FRANK <br />KAREISEN, ADOLPHUS E. IV <br />LITZ, DAVID C. <br />MAROON, HERBERT ARTHUR <br />MCNIVEN, JOHN E. JR. <br />MITCHELL, JEFFREY L. <br />NZETHAMER, CHARLES R. <br />STECHER, DANIEL D. <br />STUART, DARRELL K. <br />WESTVANG, TERRY E. <br />Description <br />BRICK CONCRETE 2" X <br />CEMENT 20 iKIN. SET 5 <br />COUPLING 12" CLAY X <br />12" PVC X PVC FERNCO <br />FRAME & GRATE (D/P <br />TOP COARSE <br />CB15/RISER <br />CB15/BASE <br />PIPE 8" PVC SEWER <br />PIPE 12" PVC SEWER <br />Planned Hrs Actual Hrs <br />----------- ---------- <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />18.50 <br />7.00 <br />4.00 <br />8.00 <br />4.00 <br />4.00 <br />4.00 <br />4.00 <br />6.50 <br />4.00 <br />22.50 <br />8.00 <br />8.00 <br />6.50 <br />8.00 <br />Total Labor Cost: <br />Cost <br />374.26 <br />156.52 <br />63.12 <br />126.24 <br />32.00 <br />56.52 <br />76.60 <br />82.08 <br />91.85 <br />78.32 <br />440.55 <br />124.64 <br />162.96 <br />124.48 <br />126.24 <br />2116.37 <br />Date # Used Cost <br />------ -------- ------- <br />4" X S" 04/25/1997 30 8.70 <br />0 LB. BAG 04/25/1997 2 23.70 <br />12" Cl/PL 02 28 1997 1 23.37 <br />(SALVAGE) 2/28 1997 • <br />SALVAGE) 04/28/1997 1 0.00 <br />04/28/1997 5 69.40 <br />(ASSOC) 04/29/1997 1 51.98 <br />(ASSOC) 04/29/1997 1 113.72 <br />04/28/1997 34 73.44 <br />02/28/1997 1 4.97 <br />