My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
915 51ST ST SW 2016-01-01 MF Import
>
Address Records
>
51ST ST SW
>
915
>
915 51ST ST SW 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 4:32:10 PM
Creation date
3/31/2017 3:44:41 PM
Metadata
Fields
Template:
Address Document
Street Name
51ST ST SW
Street Number
915
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLOSED CM WORR ORDERS REPORT <br />Total Utility Maintenance Management System <br />05/15/1997 Page 2 <br />----------- <br />-_ ------------------------------------------ <br />------____�-------------------- ---------------------- <br />Date Ranga :01/09/1989 - 05/15/1997 <br />CM Work Order Range :1001091070001 - 8401086700001Pattern :7101236730191 <br />Item Range :<Blank> - WVL3694L05 Pattern :* <br />Proqram AI,L Function ALL Activity ALL <br />��--- ----------------__ =_==-_____ = = =_______-� _�__� <br />CM WORK ORDER ID: 7101236730191 (continued) <br />PIPE50304547 PIPE 12" PVC SEWER <br />PLUG44300947 PLUG 6" DUO SEAL °SEWER" <br />PLUG48306447 PLUG 10" DUO SEAL "SEWER" <br />vehsales: <br />ID <br />V0010 <br />V2112 <br />V2152 <br />V2225 <br />V2230 <br />V2231 <br />V3200 <br />V3507 <br />V6401 <br />V6807 <br />VJ0002 <br />VJ0004 <br />VJ0017 <br />Description <br />'92 GMC S10 PU <br />91 CHEV 1 TON <br />87 DODGE W/HOIST <br />88 FORD 8YD <br />91 FORD F800 DUMP 5 YARD <br />90 FORD DUMP 5-YARD <br />80 CASE VIBROMAI{ W25 ROLLER <br />88 CASE BACKHOE 4X4 <br />80 CASE FLATBED TRAILER <br />89 COMPRESSOR IR <br />93 INTERNATIONAL 10 YD <br />'95 CHEV 1-TON <br />�56 FORD 5 YARD <br />04/28/1997 26 <br />04/28/1997 1 <br />04/28/1997 1 <br />Total Material Cost: <br />Hours <br />7.00 <br />4.00 <br />8.00 <br />4.00 <br />22.50 <br />6.59 <br />4.00 <br />22.50 <br />4.00 <br />8.00 <br />8.00 <br />14.50 <br />4.00 <br />Total '�1eh�.cle Cost: <br />Cost <br />37.80 <br />21.24 <br />38.40 <br />61.44 <br />243.00 <br />67.60 <br />78.88 <br />830.25 <br />0.00 <br />38.40 <br />171.20 <br />85.55 <br />59.00 <br />1732.76 <br />129.22 <br />9.91 <br />39.52 <br />547.93 <br />' 0��5 I D <br />3�� •g3 � <br />Work Description: <br />-------------------------------------------------------------------------------- <br />INSTALLED CB 15-TIED IN TO EXITING CBS. RAN 12" Oi)T AND OVER BANK. <br />Total cost foT work order 7101236730191: 4397.05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.