Laserfiche WebLink
2. <br />3. <br />EXHIBIT C <br />SURVEYING SERVICES PROJECT SCOPE AND ESTIMATE <br />(To be c�mpletea prior to beginning of work) <br />Project Scope (completed by Project Engineer): <br />Proiect Title <br />Schwab Topo. 8 HT. Cert. <br />3321 52"' Place SW <br />Everett, WA 98203 <br />Cost Estimate (completed by Surveying Firm): <br />Labor <br />3-Man Field Crew <br />Office Technician <br />P.L.S. <br />Total Cost $ 1893.00 <br />Hours <br />Sx168 <br />5x69 <br />2x102 <br />W.O.# <br />Cost <br />1344.00 <br />345.00 <br />204.00 <br />Other costs-Extra Work/Change Order (completed, initialed and da;ed by <br />Project Engineer and Surveying Firm): <br />Accepted: <br />Project Engineer <br />Date <br />CC: Accounting <br />� <br />rveying Firm <br />�-yl-oz <br />Date <br />H/DOCS/CITY OF EVERETT/SURVEYING SERVICES <br />