My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1900 52ND ST SE 2018-01-02 MF Import
>
Address Records
>
52ND ST SE
>
1900
>
1900 52ND ST SE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 11:08:57 AM
Creation date
3/31/2017 4:05:45 PM
Metadata
Fields
Template:
Address Document
Street Name
52ND ST SE
Street Number
1900
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. n..AI V. �1Ilb <br />«i'rri\T FHA CASE NO. Jl/ : 2D'_; <br />ADDRESS /i/ — 472 ; i <br />DATE <br />Specific commitment conditions applicable when checked) <br />Note: A.1.1 required repairs must be completed in a professional manner. <br />All certifications and/or pest control certificate of completion must be submitted <br />lined and any repair work c <br />VC11 [] This commitment is issued on the condition that if the mortgage is to be insured under <br />Section 235(i) or (j), the seller will execute an agreement, in the form prescribed by <br />the Secretary, to reimburse HUD for expenses incurred in repairing defects found eli- <br />gible .'or repair under Section 518(b). Also, a seller who is not the last permanent <br />occupant of the property and who is not substantially rehabilitating the property uncle <br />Section 235 must deposit 5 percent of the sales price in escrow with the mortgagee in <br />accordance with terms of the seller's agreement. ' <br />VC12 Submit certification from tho local authority having jurisdiction that the subject <br />property is in compliance with the Local Minimum Housing Code. <br />VC13 Submit certification -from a state licensed pest control operator that wood destroying <br />organisms, fungus and/or rot damage in all of the dwelling, interior and exterior, hav <br />been eliminated. A "Standard Notice of Work Completed" or a report form :indicating no <br />infestation may be submitted as certification. Note: All repairs must be completed <br />in conformance with l=.! professional building standards and local building codes. <br />VC14 [ 7 SupmL a certification on approved form from a licensed [� plumbing Q heating <br />Q electrical contractor certifying that the appropriate system(r) is in good <br />opcable condition, is properly installed, and is er,nsistent with code enforcement <br />standards applicable to this jurisdiction. <br />VC15 L.J Furnish evidence from the local health authority indicating approval of the <br />0 individual water supply system, Q individual sewage disposal system. <br />VC16 0 Submit certification from the state electrical inspector that service panel and <br />electrical distribution system conforms with present State Electrical Code. <br />VC17 Q (a) Q re -roof Cl repair roof of Q dwelling and/or L] garage with minimum <br />�1235# self sealing composition shingles or #1 cedar shingles, and repair sheathing and <br />install new (lashings as necessary. Remove all old roofing when two or more layers <br />exist. Composition or cedar shingles not acceptable over a "built-up" roof. Contract, <br />to certify that required work is complete and roof is in good condition. <br />/X/ (b) Submit certification from roofing contractor that roof is in good condition <br />ffr--% and not in need of repair or replacement. <br />VC18 0 Paint all exterior metal and wood trim of 0 house and/or [7 garage after adequately <br />preparing surface. <br />VC19 Q Paint entire exterior of C7 house and/or C7 garage including trim. Prepare ::11r1'aco <br />by repairing damaged areas, remove all loose paint and blisters and apply an undercoat <br />to all bare wood. <br />VC20 0 Remove the existing floor covering in the following rooms: <br />Replace with new resilient floor covering over suitable underlayment after making <br />necessary repau•s to subfloor. Carpeting not acceptable in kitchen and bath areas. <br />VC21 C7 Repair, paint and caulk all window sash and doors to operative condition. Minimum of <br />one window shall open in each room. <br />i <br />VC22 Install a 3 4" non-adjustable temperature and pressure relief valve on hot water tank; <br />a,�y3 a 314 discharge line to outside or to an interior drain. Rating of valve shall <br />not be greater than pressure rating of water tank. <br />VC23 Q Q (a) Replace all deteriorated rotted or damaged wood foundation and framing members <br />including posts, plates, beams and joists in underfloor area, with sound material. <br />No wood to remain within 6" of ground. <br />C7 (b) Replace all skirting and other wood in contact with the ground and replace <br />with material resistant: to rot and infestation. Finish all exposed new or rupuired <br />work to match exterior. No wood to remain within 6" of ground. <br />VC24 % / J (a) Install new gutters under all eaves on main building. Provide adequate down- <br />spouts and splash blocks. Apply primer and two coats of exterior paint to rrnt-ch <br />existing finish. <br />0 (b) Install elbows for downspouts and provide splash bl.ocltn to carry cool' water ul <br />least three feet away from foundation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.