My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5700 23RD DR W 2016-01-01 MF Import
>
Address Records
>
23RD DR W
>
5700
>
5700 23RD DR W 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2018 9:18:51 AM
Creation date
4/1/2017 9:48:28 AM
Metadata
Fields
Template:
Address Document
Street Name
23RD DR W
Street Number
5700
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
984
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> I SUBSURFACE EXPLORATION, GEOLOGIC Rs�sun.c � <br /> PRELIlbIIIHARY GEOTECHIVICAL ENGIIVEERING 1tEPORT <br /> ( SEAW�`.' CENTER, LOT 3 <br /> ( EVERETT, WASHINGTON <br /> � January 14, 1998 <br /> ProJect No. G95103A <br /> � <br /> I. PROJECT AND SITE CONDTTIONS <br /> I <br /> 1 A LNTROD T TTi�N <br /> � '1'his reporc presents the resuits of our subsurface ex loradon <br /> P , geologic hazards and geotechnical <br /> � �nS��g srudy for the proposed Seaway Center, Lot 3 commercial development. Our <br /> recommendations are preliminary in that definite building locations and/or construcdon details <br /> have not been finalizeci at the time of this report. The locaaon of the site is shown on the Vicinity <br /> R Map, Figure 7. The siu a�i approximate locadons of the explondons accomplished for this study <br /> are preseated on the Siu and Exploration Plan and Surficial Geologic Map, Figiue 2, pnce ti�e <br /> nar:re, design and loc�don of the strucnues are detem�ined, tue conclusions and recomme�ations <br /> i contained in this report should be reviewed and modified, or verified, as necessary. <br /> 1.1 Pumoce and St�n..�. <br /> 1 The purpose of this study was to provide subsurface data co be used in the re ' <br /> development of the subject project, pur study uicluded a review of available geologicliste�atue. <br /> �� excavadon of exploration pits, and rformin <br /> Pe g geologic shidies to assess the rype, ���s, <br /> distribudon and physical properties of the subsurface sediments and shai(ow ground water <br /> 1 conditions. Geologic hazards and geotec}�nic�( engi�eri�g ��� were also conducted to <br /> determine suitable geologic hazard micigadon techniqaes, the typ� of suitable foundations, <br /> ' allowable foundation soil bearing pressures, anticipated foundation settlemenis, floor support <br /> recommendadons, and drainage considerations. This report s»n+n+Ar�pc � �ults of our field <br /> � work and off.ers hazard midgadon and development recommendations based on our present <br /> understanding of the project. <br /> 1 �.2 .4ll h0ry7�tinn ' <br /> � Written authorizadon w proceed with this study was granted by Mr. Randy Blair of W&H Pacific <br /> on behalf of the Seaway Develop:nent Company, pur Study q,as a��p�y�h� � general <br /> accordance with our scope of work letter dated Ikcem(xr 3, 1997. This report has bcen prepared <br /> � for the exclusive use of Seaway Development Compaay and their ag�nts, for specific applicadon <br /> to this project. Within the limitations of scope, schedule and budget, our services liave bcea <br /> performed in accordance with generally acc��ter! geote�hnica� eng���g � �ng��g <br /> f <br /> � <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.