Laserfiche WebLink
� �� , <br /> � � <br /> �� <br /> FRANKLIN _� � .,: : . . .� - - =z� -�- ���= <br /> ,r—.ul:e 2O2 rA,( %FL� `JG�-Fi2�G <br /> ENGINEERING -� �nU :,,� �„��_� r��.-�=r;�< ��,�,.�.�r, <br /> MCCH�r�icA�cor�su�nn� <br /> � V�1 �(- �O �' <br /> November 5, 2009 <br /> ENVELOPE SUMMARY <br /> RE: Bridgeways <br /> Building B, Seaway Lot 3C <br /> Everett, WA <br /> Tenant improvement of shell and core warehousa buiiding into heated warehouse and <br /> conditioned office space. Project complies with 200E WSEC using the Component <br /> Performance approach with heating by Other Fuels. <br /> Vertic�i Glazing: Double pane, 1/2" space Air, low-e10 '01, fixed. Or certified tested <br /> assembly per NFRC. U =0.55, default {Table 10-61. SHGC=0.45. <br /> Doors (Opaque►: Insulated metal, U=0.60, default (Table 10-61. <br /> Other Roof: R-21 rigid insulation. U =0.046, default (Table 13-t). <br /> Wall #1 (Opaque, Exterior, Office Yloor to 9'-0" AFFI: Concrete, min. 6" thick, furred <br /> with metal st�cls, 3-1/2", 24" oc with R-13 batt insulation, U =0.107, calculated. <br /> Wall #2 (Opaque, Exterior, Office: 9'-0" AFF to roof, Warehouse: 8'-0" AFF to roofl: <br /> Concrete, min. 6" thick, with R-19 batt insulation stickpinned to concrete, <br /> U =0.053 calculated. <br /> Wall tl3 (Opaque, Tenant demising wall, floor to roofl: Metal studs, mir. 5-1/2", 16" oc <br /> with R-19 batt insulation, U=0.109 default ITable 10-5A1. <br /> Wall #4 (Opaque, Exterior, Warehouse floor to 8'-0" AFF): Concrete, min. 6" thick, no <br /> insulation, U =0.61 , default (Table 1 A-5B1. <br /> i�/� <br />