Laserfiche WebLink
. �_ <br /> JTE, Inc. <br /> Mike Collins, Division General Manager <br /> PACIFIC NORTHWEST RURAL,�METRO AMBUTANCE <br /> December 9. 2009 <br /> Page -5 <br /> traffic fee is based on PM peak hour trips and ensuring a conservative analysi,the 11 net <br /> new trips value is used. <br /> CITY OF EVERETT TRAFFIC ANALYSIS CRITERIA <br /> The City of Everett Municipal Code Chapter 18.40.040 When a Traffic An�sis is Reauired <br /> identifies lhe following: <br /> "The applicant shall provide the responsible official wilh a written traffic <br /> analysis as part of the city's proJect review process,which includes SEPA <br /> review, whenever a proposed projecl wili generate fifty or more additional <br /> peak hour trips, or if deemed necessary by the city engineer.The traffic <br /> analysis shall be paid for by the applicant and shall be prepared by a licensed <br /> professional engineer or transportation planner with standing in the Institute <br /> of Transportation Engineers or who is acceptable to the city engineer. (Ord. <br /> 2496-00 § 4, 2000: Ord. 2425-99 § 4, 1999)" <br /> The proposed project is projecled to conscrvalively generate 11 PM peak hou�trips that are <br /> Iess lhan the ihreshold required to prepare a Traffic Impact Analysis. <br /> AGENCY TRAr'fIC IMPACT MITIGATION REQUIREMENTS <br /> The City oF Everett Municipal Code Chapter 18.40.110 Re iq iirements for Transoortation <br /> Improvements when Tra(fic Analvsis is not Required identifies lhe traffic impact (ee <br /> associa[ed per net new PM peak hour trip. Letter C iden[ifies a fee of$900 per ne[ new PM <br /> peak hour trip. <br /> "C. The applicanl shall pay a fee for transportalion system improvements in <br /> an amounl equal to nine hundred dollars (or each p.m. peak hour trip that <br /> the project will produce,as determined in the latest edition of the ITE Trip <br /> Generetion Manual or as otherwise approved by the aty engineer.Any <br /> agrecment to pay in accordancc with the provisions of this sec[ion shali be in <br /> a form provided in Section 18.40.130 of this chapter." <br /> City sta(f iden[ified thc TIP at $1,OOG per PM peak hour trip in the Seaway Center area of <br /> town. The proposed project is projected to generate 11 net new PM peak hour trips thus a <br /> fee of$11,OG6 is calcuiated to be contributed lo thc Cily of 'everett. <br /> SUMMARY AND CONCLUSIONS <br /> This lette� has identified the delta trip generation (or the proposed Rural Ambulance project. <br /> The proposed project is conservatively calculated to generale 11 net new PM peak hour trips <br /> Uiat are far fewer than the 50 PM peak hour trip threshold thus the preparation of a full <br /> Traf(ic Impact Analysis should nol be required. <br /> The calcula[ed traffic impact fee at is $11,066. <br /> _ , .. <br /> '�7i3 <br />