My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5901 23RD DR W BASE FILE 2016-01-01 MF Import
>
Address Records
>
23RD DR W
>
5901
>
BASE FILE
>
5901 23RD DR W BASE FILE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2017 10:04:11 AM
Creation date
4/1/2017 10:03:30 AM
Metadata
Fields
Template:
Address Document
Street Name
23RD DR W
Street Number
5901
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. Specific crosion controls w bc implcmented prior to authorizing any construction activities which will <br /> impact an environmentally sensitive area as defined by the Ciry's environmentally sensitive area <br /> rcculations. <br /> b. For any facilities on or adjacent to erosion or landslide hazard areas,the construction management plun <br /> must address all mitigation measures identified in the ;eotechnical repon approved by the Planning <br /> Direcror. <br /> c. Implemontation of best management practices to control erosion both during and after construction, <br /> including compliae •e with the City of Everett's Design and Construction Standards and Specifications <br /> tvlanual and the Stormwater bfanagement btanual. <br /> d. Construction schedule, smms update reporting requirements, and contineency provisions to be�omz <br /> effective if the schedule s not met. (S6PA Eanh and N�. Policies) <br /> 2. 'I'he Ci . 'I require submittal of a geotechnical report when facilities are proposed!o be located in areas <br /> �vhich . �in potentially moisture sensiti��e soils. Mois[ure sensitive soils may include, bm crc not limitzd to, <br /> Toku! .+ely loaro, McKenr.a gravely silt lozm, Teric Medisaprists, and Mukilteo muck. The follo�ving <br /> minii..a n mitigation requiremcnts shall be met Cnr all earthwork for facilities on moismre sensitive soils unless <br /> oQienv�se recommended in the geotechnical report: <br /> • Limit site disturbance by u�ing tracked equipmen[, �vhere possible, within the excavation area. <br /> • Remove standing water from the escavation area. Outfall�rater should be filtered or run through a <br /> sedimentation basin. <br /> • Use surface erosion measures in areas in which surface��•arer is anticiputed to drain from the escavation <br /> arca. Reyuire ccntrol measures to be desiened by a professinnal civil or geotechnical eneineer, to pmvent <br /> o(fsite surface drainage of sediments. �lethods may include, but are not limited to, use of silt t"ences and/or <br /> setNement ponds. <br /> • Implem::nt a plun te minimizc the extent to�vhich these soils become disturbed. Soils which become <br /> disturF::d, and which are above their optimum moismrc conten[,should either be allowed to dry to within <br /> their upiimum moisture content and be ro-compacted,or be removed Crom ihe construction site. (SEPA <br /> Eanh and R'atcr Policics) <br /> 3. Any water qualiry enhancement or detention facilities proposed near steep slopes will require dztailed <br /> geotechnical analysis and desi�sn thut documents and ensures their sa(ery. (SEPA Earth und Wa[er Policies) <br /> 1. Prior to issuance of gradin�permits for removing eanh fmm n sire, the applicant rz, •demonstrate diat permits <br /> have been obtained for placement of the earth oft=site. (SEPA Earth and 1Vater Pohcies) <br /> Durin_Cons�ruction/farthwork <br /> >. All eanfnvork �+�ithin a geologically hnzardous area or its required buffcr must be perfomied undzr the <br /> s.ipervision of e professional civil or�eotechnical engineer. The engineer mus:provide cenifcation to the Ciry <br /> that all work was done in compliance with requirements se[ forth in the Ciry approved geotechnical report. <br /> (SLPA F_anh and �Vatcr Policies) <br /> 6. In ordcr to mmimize erosion during wnstruction, all soil piles shall be covered with plastic sheeting or o!her <br /> impervio.:s covering staked to the eround or anchored with rocks or sandbags. i3ertns, earthen or othenvise, <br /> must he ronstnicted at the perimeter of e�cava[ed areas to prevent adjacent site runoff from entering the <br /> excava�bns. (SGPA Eanh and Nater Policies) <br /> ?. 1'emporan�slopes ��ithin nntive glacial soils shall be limited to .i maximum angle of I/2 foot horizontal(H)m I <br /> foot venical (V). Temporary slopes w�thin fil; soils shall be F,mited to a maximum angle of IH:I V. Temporary <br /> slopes must be covered«ith an impennea6lz membrane,such as visqueen or mulch, in order to prevent <br /> precipitation Gom coming in contact with the soils. (S[PA C-anh and Water Policies) <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.