Laserfiche WebLink
�l. � � � <br /> _I <br /> 1.0 IN"RODUCTION <br /> _I <br /> This report presents Landau Associates' geotechnical engineering conclusions and design <br /> � rec:ommendations for proposed additions to the Verizon Eastmont Remote Switch Unit (RSU) Bailding <br /> Addition, located at 10008 25th Avenue SE in Everett, Washington. The project location is shown o:�the <br /> � Vicinity Map, Figure 1. The Site Plan, Figure 2, shows the building layout, the location of explorations <br /> completed for the project,and the location ofprevious explorations conducted for the existing building. <br /> � I <br /> 1.1 PROJECT UNDERSTANDING <br /> We undetstand that Verizon is proposing to constcucf two additions to the existing Eastmont RSU <br /> structure. Thc existing structure consists of a single-story building about 34 by 44 ft in plan dimensions. <br /> The building is reportedly in good condition. A 20 by 34 R addition is planned off the south end of the <br /> � existing building and a 12 by 26 ft addition is planned off the east side of the existing building. A new <br /> ; pad of crushed surfacing is planned along the east side for a fuel tank and condenser. The additions will <br /> consist of single-story, wood-framed structures with concrete slabon-grade floors. Foundation loads are <br /> expected to be relatively light. <br /> Landau Associates completed a previous investigation of the site to support design and <br /> const�Uc�ion of the existing RSU building. Our findings, conclusions, and recommendations were <br /> summarized in a November 16, 1989 geotechnical report submitted to Veriwn(GTE N�. <br /> • 1.2 SCOPE OF SERVICES <br /> Landau Associates was contracted by Verizon to provide geotechnical engineering services to <br /> support the project. Our services were provided in accordance with the scope of services outlined in our <br /> proposal dated March 29,2002. Written authorization to proceed was provided by Verizon. <br /> Our scope of services includes the following specific tasks: <br /> • Review the November 16, 1989 Geotechnical Report prepared for the existing structure by <br /> Landau Associates. <br /> • Complete a limited field exploration program to supplement the previous explorations and to <br /> characterize near-surface soil and groundwater conditions in the area of the proposed <br /> "' additions. <br /> • Develop geotechnical engineering conclusions and recommendations for site development <br /> -- including: <br /> - subgrade preparation Cor slab-on-grade floors <br /> �� SRBN2 1�.1PROJECT1011005.0101EASTMDNT RPT.Dp� • � <br /> � " �-� LANDAUASSOCIATES � <br />